Garden State Parkway
Route information | ||||
---|---|---|---|---|
Maintained by NJTA | ||||
Length | 172.40 mi[1] (277.45 km) | |||
Existed | June 29, 1950 | –present|||
History | Completed 1956; NY extension completed 1957 | |||
Component highways | Route 444 (unsigned) | |||
Tourist routes | Pine Barrens Byway | |||
Restrictions | No trucks north of exit 105; all trucks over 13"- 11" must exit at exit 29 | |||
Major junctions | ||||
South end | Route 109 in Lower Township | |||
| ||||
North end | G.S. Parkway Connector at the New York state line | |||
Location | ||||
Country | United States | |||
State | New Jersey | |||
Counties | Cape May, Atlantic, Burlington, Ocean, Monmouth, Middlesex, Union, Essex, Passaic, Bergen | |||
Highway system | ||||
New Jersey Turnpike Authority | ||||
|
The Garden State Parkway (GSP) is a controlled-access toll road that stretches the north–south length of eastern New Jersey from the state's southernmost tip near Cape May north to the New York state line at Montvale. Its name refers to New Jersey's nickname, the "Garden State". The parkway has an unsigned reference number of Route 444 by the New Jersey Department of Transportation (NJDOT). At its north end, the road becomes the Garden State Parkway Connector, a component of the New York State Thruway system that connects to the Thruway mainline in Ramapo, New York.
The Garden State Parkway is the longest highway in the state at approximately 172 miles (277 km), and, according to the International Bridge, Tunnel and Turnpike Association, was the busiest toll road in the United States in 2006.[2] Most of the highway north of the Raritan River runs through heavily populated areas. Between the Raritan River and Toms River, the highway passes through lighter suburban development, while south of Toms River, the road mostly runs through unspoiled wilderness in the Pine Barrens and swampland, interspersed with small towns and Jersey Shore beach communities. The highway has a posted speed limit of 65 miles per hour (105 km/h) for most of its length and is primarily for passenger vehicle use; trucks weighing over 10,000 pounds (4,500 kg) are prohibited north of exit 105.
The parkway was constructed between 1946 and 1957 to connect suburban Northern New Jersey with the Jersey Shore resort areas along the Atlantic coast and to alleviate traffic on traditional north–south routes running through each town center, such as US Route 1 (US 1), US 9, and Route 35. During planning and construction of the first segment, the road was to be a toll-free highway designated as the Route 4 Parkway. However, a lack of funding caused the remainder of the parkway to be built as a toll road. The highway has seen many improvements over the years, including the addition and reconstruction of interchanges, bridge replacements, widening of the roadway, and removal of at-grade intersections. Previously, the road had been maintained by an agency known as the New Jersey Highway Authority, however in 2003, the agency merged into the New Jersey Turnpike Authority (NJTA), which now maintains the parkway along with the New Jersey Turnpike.
The parkway uses an open system of toll collection with flat-fee tolls collected at 11 toll plazas along the roadway, as well as at several entrances and exits. Tolls can be paid using cash or via the E-ZPass electronic toll collection system. Along the route are 11 service areas, providing food and fuel to travelers. Historically, the road had ten picnic areas along its length, but only one remains open today.
Route description
[edit]The Garden State Parkway begins at Route 109 in Cape May County. It runs north along the Jersey Shore, crossing the Great Egg Harbor Bay and passing to the west of Atlantic City. The parkway passes through the sparsely populated Pine Barrens until it reaches Toms River in Ocean County. From here, the road heads into suburban areas. North of Tinton Falls, the route splits into a local-express lane configuration, which it maintains through Sayreville. Here, the highway crosses the Raritan River into Woodbridge Township, where it meets the New Jersey Turnpike (Interstate 95, I-95). North of here, the Garden State Parkway passes through densely populated communities in Middlesex and Union counties and intersects I-78 near Newark. The parkway eventually passes to the south and east of Paterson and meets I-80 in Saddle Brook. After traversing the suburban northern section of Bergen County, the road enters the state of New York where it becomes the Garden State Parkway Connector, continuing north to the New York State Thruway mainline.[1][3]
The parkway serves as a major route connecting North Jersey with all of the state's shore points, and as such, is subject to frequent congestion. The number of lanes on the parkway ranges from four in Cape May, Atlantic, and Bergen counties, to 15 on the Driscoll Bridge. Much of the highway runs closely parallel to, or concurrently with US 9.[3] The speed limit on the parkway is 65 mph (105 km/h) for most of its length. However, it is posted at 55 mph (90 km/h) on a five-mile (8.0 km) section near Toms River and on a 40-mile (64 km) section between Sayreville and Paramus.[3] The NJTA may temporarily reduce the speed limit when special hazards exist.[4] Commercial trucks with a registered weight of over 10,000 pounds (4,500 kg) are not allowed to use the parkway north of exit 105, just past the Asbury Park Toll Plaza.[5] The entire length of the Garden State Parkway carries the unsigned designation of Route 444,[1] and is part of the National Highway System,[6] a network of roads important to the country's economy, defense, and mobility.[7]
Cape May and Atlantic counties
[edit]The parkway begins at an at-grade intersection with Route 109 in Lower Township, Cape May County, where Route 109 continues south toward Cape May and west toward US 9 and the Cape May–Lewes Ferry. The Garden State Parkway runs north as a four-lane freeway on the Cape May Peninsula through the Cape Island Wildlife Management Area, running west of swampland, separating the highway from the Jersey Shore communities. Trees occupy the median and the sides of the road for the next several miles. After passing to the east of Cape May National Golf Club, crossing over Jones Creek, and passing a pond in the median, the highway enters Middle Township and has an interchange with Route 47, which serves The Wildwoods resort area and the community of Rio Grande. North of this point, the parkway crosses over the abandoned Wildwood Branch of the Pennsylvania-Reading Seashore Lines, and afterwards, the trees in the median disappear and the highway has a partial interchange with Route 147, which provides access to North Wildwood, Whitesboro, and Burleigh. Crossing into the county seat of Cape May Court House, the median narrows and US 9 appears within yards of the southbound lanes of the parkway as it passes west of The Shore Club golf course. The two highways then split apart and the Garden State Parkway bisects residential areas before reaching an interchange for Stone Harbor Boulevard (CR 657), which serves the Cape Regional Medical Center and Stone Harbor.[1][3][8]
Past this point, the road comes to an interchange for Crest Haven Road (CR 609), which provides access to the Cape May County Park & Zoo and a building complex containing the Cape May County Technical School District. After a southbound entrance ramp from US 9, the parkway leaves Cape May Court House and returns to a desolate wooded setting with a wide tree-filled median. Continuing north, the parkway has an interchange with Avalon Boulevard (CR 601), serving Avalon and Swainton. North of this point, the highway enters Dennis Township and has an partial interchange with Sea Isle Boulevard (CR 625), serving Sea Isle City before reaching the Bruce Willis Service Area in the median. Past the service area, the parkway enters Upper Township and reaches the Cape May Toll Plaza northbound immediately before meeting the southern terminus of Route 50, which serves Seaville, at a partial interchange. After passing east of several homes and a golf course, the parkway has the John B. Townsend Shoemaker Holly Picnic Area in the median before it crosses over the abandoned Pennsylvania-Reading Seashore Lines Ocean City Branch. Continuing north, the highway comes to a diamond interchange with US 9 and Roosevelt Boulevard (CR 623), which serves Ocean City and Marmora. North of this exit, US 9 begins to run concurrently with the Garden State Parkway, and the two routes run east of the community of Beesleys Point before the median narrows, and they cross the Great Egg Harbor Bay on the Great Egg Harbor Bridge.[1][3][8]
The highway surfaces into Somers Point, Atlantic County, where the southbound roadway has the Great Egg Toll Plaza before US 9 leaves the parkway at a partial junction. Past this point, the median widens and the parkway passes west of the Greate Bay Country Club and some homes before a partial interchange with West Laurel Drive, which provides access to Somers Point and Ocean City. After passing to the west of more residences, the median briefly becomes a Jersey barrier as the route crosses the Patcong Creek into Egg Harbor Township, where developments begin to appear on the west side of the highway. Eventually, the parkway crosses into uninhabited areas again before heading into a commercial area and widening to six lanes. Here, the road has an interchange with Black Horse Pike (US 40/US 322) and Tilton Road (CR 563), marking the first of three interchanges with roads that serve Atlantic City, located to the east. The median then transitions to a Jersey barrier and the parkway passes over the abandoned Pennsylvania-Reading Seashore Lines Newfield Branch before an partial interchange with Washington Avenue (CR 608) and a cloverleaf interchange with the controlled-access Atlantic City Expressway (which heads west towards Philadelphia), where the northbound and southbound roadways split apart again. Upon leaving the commercial area, the highway passes to the east of Atlantic City International Airport and crosses over a flume of the Atlantic City Reservoir, which has a basin on each side of the highway. Continuing north, the highway enters Galloway Township and passes over NJ Transit's Atlantic City Line before it comes to a partial interchange with White Horse Pike (US 30), serving Absecon. North of this exit, the median is home to the Frank Sinatra Service Area, which also has a barrack of the New Jersey State Police. Immediately north of the service plaza, the parkway has an interchange with Jimmie Leeds Road (CR 561), serving the community of Pomona. The parkway then enters the sparsely populated Pine Barrens, passing to the east of Stockton University and reaching an interchange with Pomona Road (CR 575/CR 561 Alt.) Past this point, the road turns northeast and crosses into Port Republic as it winds north into the uninhabited Port Republic Wildlife Management Area. With some occasional development appearing along the sides of the road, the median narrows to a Jersey barrier as US 9 merges back onto the parkway, along with the Pine Barrens Byway, and the three routes cross the Mullica River.[1][3][8]
Burlington and Ocean counties
[edit]The highway surfaces into Bass River Township, Burlington County, and US 9 and the Pine Barrens Byway depart at a partial interchange. Continuing northeast past the community of New Gretna, the parkway passes over US 9 with no access before crossing the Bass River and the median widens and contains a maintenance yard. Past this point, the median temporarily narrows again as the northbound lanes have the New Gretna Toll Plaza. Crossing northward through Bass River State Forest, the six-lane highway becomes desolate as it enters Little Egg Harbor Township, Ocean County. Here, the Garden State Parkway interchanges with North Green Street (CR 539), which serves Tuckerton, before entering Eagleswood, where it crosses over Westecunk Creek and passes to the west of Eagles Nest Airport. Afterwards, the parkway enters Stafford Township where development along the road begins to increase. Here, the highway has an interchange with Route 72, which provides access to Manahawkin and Long Beach Island. The parkway then forms a border between residential neighborhoods to the west and forest to the east before passing to the east of a golf course and entering Barnegat, where the concentration of houses shifts to the east. After an interchange with West Bay Avenue (CR 554), the parkway passes by residential neighborhoods on both sides of the highway before the median shortly narrows and the southbound roadway has the Barnegat Toll Plaza. Now in Ocean Township, the parkway meets the interchange with Wells Mills Road (CR 532) and crosses over Oyster Creek before entering Lacey Township, where it crosses the south, middle, and north branches of the Forked River before reaching an interchange with CR 614, serving the community of Forked River, and the Celia Cruz Service Area in the median.[1][3][8]
Father north, the road crosses over Cedar Creek and enters Berkeley Township, passing west of a golf course and Central Regional High School while traversing Double Trouble State Park. The route then crosses into Beachwood and passes west of several homes before entering South Toms River, where the median narrows and the parkway becomes concurrently with US 9 once again at an interchange with CR 530. After crossing the Toms River and entering Toms River, the highway passes west of the Toms River Bus Terminal serving NJ Transit buses. Past this point, the road crosses the abandoned Conrail Barnegat Branch and reaches an exit for Lakehurst Road (CR 527) before passing trees and reaching a cloverleaf interchange with Route 37, which provides access to Lakehurst, Seaside Heights, and Island Beach State Park. After heading northwest between trees on the west and neighborhoods on the east, the Garden State Parkway turns northeast as the median widens and contains a maintenance yard, and US 9 leaves the parkway at an interchange with Route 166. Past the interchange, the parkway reaches the bi-directional Toms River Toll Plaza and passes by lighter suburban development in addition to parkland, with Ocean County College to the east. Upon entering Lakewood Township, the parkway has an interchange with Route 70, serving Brick Township and Point Pleasant to the east; this interchange also serves CR 528. Running along the border of Lakewood and Brick townships, the route has an interchange with CR 549 before crossing the South Branch of the Metedeconk River and passing over Route 88 with no access. Now entirely within Brick Township, the route crosses the North Branch of the Metedeconk River and reaches a second exit for CR 549, where a pedestrian bridge for the Brick Park & Ride, located to the east, passes over the parkway. North of this interchange, the road widens to eight lanes and passes west of a solar farm.[1][3][8]
Monmouth and Middlesex counties
[edit]Upon entering Wall Township, Monmouth County, the southbound lanes have a truck inspection area and the parkway passes west of Brick Township Reservoir through woods. The parkway crosses the Manasquan River and passes under the Capital to Coast Trail before reaching a large interchange near Allaire State Park. The interchange includes a pair of collector-distributor roads and serves the eastern terminus of I-195 (which runs west across Central Jersey toward Trenton), Route 34 (which runs southeast toward Point Pleasant), and Route 138 (which runs east toward Belmar). A park and ride is present in the southeastern cloverleaf with Route 138. Passing to the west of Shark River Park, the median contains the Judy Blume Service Area, which provides a park and ride for commuters and access to Belmar Boulevard (CR 18). The parkway enters Tinton Falls and has exits for Route 33, which runs east toward Bradley Beach and west towards Freehold Township, and Route 66, which heads east towards Asbury Park. Soon afterwards, the parkway passes to the west of the Jersey Shore Premium Outlets and has a partial exit for Asbury Avenue (CR 16), where the road widens to ten lanes. North of this point, the parkway reaches the northbound Asbury Park Toll Plaza.[1][3]
Immediately north of the toll barrier, the road divides into a local-express lane configuration with two express and three local lanes in each direction. The parkway passes to the east of a solar farm before reaching an interchange with Route 18 and Route 36, which head north towards New Brunswick and east towards Long Branch, respectively. The connector road from the parkway to the western terminus of Route 36 and Hope Road (CR 51) is designated by the New Jersey Department of Transportation as Route 444S.[9] North of the interchange, the Garden State Parkway passes over the Southern Secondary railroad line operated by the Delaware and Raritan River Railroad and bisects residential neighborhoods before crossing the Swimming River into Middletown Township, where the road has an interchange with CR 520, which contains a park and ride and serves Red Bank and Lincroft. The parkway then passes over Normandy Road, which serves as a road and railroad link between the two sections of Naval Weapons Station Earle. Continuing northwest past houses and parks, the route has an interchange with Red Hill Road (CR 52) as it enters Holmdel Township, where it serves the PNC Bank Arts Center and the New Jersey Vietnam Veterans' Memorial. Upon entering Hazlet, the parkway crosses NJ Transit's North Jersey Coast Line before reaching an interchange for Route 35 and Route 36, which serves Keyport. At this point, the express roadway in each direction gains a third lane. Immediately north of here is a southbound exit and entrance at Lloyd Road (CR 3), where the parkway briefly enters Aberdeen Township and passes over the Matawan Creek before crossing the North Jersey Coast Line for a second time while the southbound lanes of the parkway briefly enters Matawan. Upon entering Old Bridge Township, Middlesex County, and reaching an interchange for Matawan Road (CR 626) serving Matawan, the highway enters Cheesequake State Park.[1][3]
After crossing the Cheesequake Creek near a marina and leaving the park, the road enters Sayreville and has the Jon Bon Jovi Service Area in the median, with access to both the express and local lanes of the highway. Passing to the southwest of South Amboy, the parkway has an partial interchange with US 9 and passes over Conrail Shared Assets Operations' Amboy Secondary line. After a northbound entrance and southbound exit at Main Street (CR 670), the lanes, now as a 4-3-3-4 configuration, merge as they cross the abandoned Raritan River Railroad and reach the Raritan Toll Plaza southbound. North of the toll barrier is an exit for Chevalier Avenue; all southbound vehicles exiting here must have an E-ZPass transponder.[1][3][8] Paralleling US 9 and Route 35, the parkway becomes 15 lanes as it crosses the Raritan River on the Driscoll Bridge, the widest motor vehicle bridge in the world.[10] On the bridge, the northbound lanes are divided into two roadways; only the eastern roadway has access to exit 127, an interchange for US 9 and Route 440, providing access to the Outerbridge Crossing to Staten Island. Just north of exit 127 in Woodbridge Township, the parkway runs in between the northbound and southbound lanes of US 9. After passing under Conrail Shared Assets Operations' Perth Amboy Running Track, US 9 splits off to the east and the parkway reaches an interchange with the New Jersey Turnpike (I-95). Running northwest through Woodbridge as a ten-lane roadway, the highway has an interchange with US 1 and crosses under Conrail Shared Assets Operations' Port Reading Secondary line as it enters the community of Iselin, passing to the east of several corporate offices. Immediately after passing under Amtrak's Northeast Corridor east of the Metropark station serving Amtrak and NJ Transit's Northeast Corridor Line, the GSP has an interchange with Route 27, which serves Rahway to the northeast. North of this point, the parkway curves northeast through densely populated neighborhoods, passing the Colonia South and Colonia North service areas.[1][3][8]
Union and Essex counties
[edit]Crossing into Clark, Union County, the highway continues to pass through dense neighborhoods as a ten-lane roadway with a Jersey barrier. After crossing the Robinson's Branch Reservoir and passing an interchange with Central Avenue (CR 613), the southbound lanes have access to a maintenance yard. The highway then passes west of a park and Winfield Township before crossing the Rahway River into Cranford, where there is an interchange with Raritan Road (CR 607) and Centennial Avenue (CR 615). After passing west of a business park and over Conrail Shared Assets Operations' Lehigh Line and the inactive Rahway Valley Railroad, the parkway crosses NJ Transit's Raritan Valley Line and reaches an interchange with Route 28, which serves Roselle Park to the east. Upon entering Kenilworth, the highway passes many businesses before the road meets the interchange with Galloping Hill Road (CR 509), passes to the east of Galloping Hill Golf Course, and enters Union, where the parkway has an interchange with Chestnut Street (CR 619). Immediately afterwards, the road comes to an interchange with US 22 and Route 82 serving Hillside, where the Garden State Parkway briefly runs in between the carriageways of US 22 and the Union Watersphere appears on the east side of the parkway. Here, the parkway narrows to eight lanes, and the northbound lanes have access to the Whitney Houston Service Area. After the service area, the road crosses the Elizabeth River and briefly enters Hillside, where it reaches the northbound Union Toll Plaza before an interchange with I-78.[1][3]
Running northeast into Irvington, Essex County, the highway passes west of a park and east of many houses before reaching a pair of interchanges for local roads and passing through a short tunnel underneath a parking lot for Irvington Bus Terminal, serving NJ Transit buses. North of this point, the parkway gains frontage roads in each direction, which are mostly lined by residences. The frontage road for the northbound lanes is called Eastern Parkway, and the frontage road for the southbound lanes is called Western Parkway. After an interchange with South Orange Avenue (CR 510), the frontage roads end, and the parkway briefly enters Newark where it bisects Holy Sepulchre Cemetery, the northern end of which is in East Orange. After leaving the cemetery, the highway regains frontage roads which are known as Oraton Parkway. After passing East Orange General Hospital's Eastern Pavilion, the parkway comes to an interchange with I-280 and Central Avenue (CR 508), which serve Downtown Newark. At the interchange, the Garden State Parkway loses a lane in each direction and passes under NJ Transit's Morris & Essex Lines near East Orange station. The parkway continues to run in between frontage roads containing many houses before passing west of several apartment buildings and hospitals and crossing the abandoned Orange Branch of the New York and Greenwood Lake Railway. Winding into Bloomfield as a six-lane roadway, the Garden State Parkway crosses NJ Transit's Montclair-Boonton Line and has an interchange with Bloomfield Avenue (CR 506 Spur), where the frontage roads end. After passing under Norfolk Southern Railway's Boonton Line and reaching an exit for Belleville Avenue (CR 506), the parkway enters a more suburban area and the southbound parkway has the Essex Toll Plaza. The highway briefly enters Nutley before crossing back into Bloomfield, where the jersey barrier becomes a grassy median and the parkway reaches a diamond interchange for Watchung Avenue (CR 655) serving Montclair and passing the Larry Doby and Connie Chung service areas, serving northbound and southbound traffic respectively, to the west of the Upper Montclair Country Club.[1][3][8]
Passaic and Bergen counties
[edit]The parkway crosses into Clifton, Passaic County, where it reaches an interchange with Route 3. At this point, the space between the northbound and southbound roadways contains the Allwood Road Park and Ride serving NJ Transit buses. After passing under a set of power lines and bisecting a residential area, the route has an incomplete interchange with US 46. Immediately north, the parkway meets the southern terminus of the Route 19 freeway, which heads north toward Paterson. Past this point, the highway curves northeast and passes over NJ Transit's Main Line before the median transitions to a Jersey barrier and the highway has a northbound exit and southbound entrance at Hazel Street (CR 702), serving Passaic. The parkway heads northeast past many homes before heading into a business district and crossing Norfolk Southern's Passaic Spur line. After passing many more residences near the route, the parkway reaches a partial interchange with the southern terminus of Route 20. Immediately afterwards, the parkway crosses the Passaic River and enters Elmwood Park, Bergen County, where it comes to a second interchange with US 46, serving Garfield. Passing more homes, followed by several businesses, the highway then passes over the New York, Susquehanna and Western Railway's New Jersey Subdivision line and under NJ Transit's Bergen County Line before reaching an interchange with I-80 and the northbound Bergen Toll Plaza in Saddle Brook.[1][3]
Continuing northeast, the road passes through Saddle River County Park and crosses the Saddle River tributary into Rochelle Park. After leaving the park, it crosses a pair of interchanges for Route 208 and Route 4 as it enters Paramus near the Garden State Plaza shopping mall. North of Route 4, the parkway passes east of the Arcola Country Club and runs closely parallel with Route 17 before interchanging with it. Past this interchange, the median becomes grass-filled. After passing east of businesses and west of homes, the parkway passes in between the Paramus Park shopping mall and New Bridge Medical Center before reaching an interchange with East Ridgewood Avenue (CR 80), which serves Oradell and has a park and ride. After bisecting residential neighborhoods, the parkway has an partial interchange with Linwood Avenue (CR 110) before entering Washington Township where the southbound lanes have the Pascack Valley Toll Plaza—the northernmost toll plaza on the highway. North of the toll plaza, the median becomes substantially wider and trees begin to appear within it. The Garden State Parkway finally narrows from six to four lanes at the exit for Washington Avenue (CR 502), serving Westwood and Emerson. Winding through the Pascack Valley region of Bergen County past many homes and woodland, the parkway briefly enters Hillsdale before entering Woodcliff Lake, where there is a northbound exit and southbound entrance for Chestnut Ridge Road, which is accessed via CR S73 and serves Saddle River. The parkway then enters Montvale, where it reaches the James Gandolfini Service Area, the northernmost service area on the road. Immediately north is an exit for Grand Avenue (CR 94) serving Park Ridge; this is the northernmost exit of the Garden State Parkway, which crosses into the state of New York soon afterwards. From there, the route becomes the Garden State Parkway Connector, a component of the New York State Thruway system, which heads north toward the thruway mainline (I-87/I-287) in Nanuet.[1][3]
History
[edit]1950s
[edit]Plans for the Garden State Parkway date back to 1942, where it would have connected to the Palisades Interstate Parkway in Fort Lee.[11] Following World War II, traffic increased substantially on highways along the New Jersey coast. Due to the high traffic volume and presence of numerous traffic lights, it took motorists over three hours to travel between Paterson and Atlantic City. In 1946, plans were changed to construct a high-speed parkway to provide a bypass of Route 4, which, prior to 1953, ran from Cape May north to the George Washington Bridge by way of Paterson, largely following present-day US 1, US 9, and Route 35.[12][13] This highway would be constructed using state funds and be known as the Route 4 Parkway. Construction began in 1947, and the first section to open ran from Route 27 north to Cranford and opened on June 29, 1950.[14]
The landscape architect and engineer in charge of the newly named Garden State Parkway was Gilmore David Clarke of the engineering firm Parsons Brinckerhoff, who had worked with Robert Moses on the parkway systems around New York City. Clarke's design prototypes for the parkway combined the example of the Pennsylvania Turnpike, a model of efficiency with parallels in the German autobahn routes of the 1930s, with the Merritt Parkway model that stressed a planted "green belt" for beauty. Both design models featured wide planted medians to prevent head-on collisions and mask the glare of oncoming headlights. The Garden State Parkway was designed to have a natural feel. Many trees were planted, and the only signs were those for exits—there were no distracting billboards. Most of the signs were constructed from wood, or a dark-brown metal, instead of the chrome bars used on most other highways. The guardrails were also made from wood and dark metal. Most early overpasses were stone, but were later changed to concrete, with green rails and retro etchings, popular around the 1950s and 1960s. The parkway was designed to curve gently throughout its length so that drivers would remain alert and not fall asleep at the wheel.[15][16]
The highway was extended south to New Brunswick Avenue in Woodbridge Township, Middlesex County, on November 1 that year,[17] In Cape May County, a four-mile (6.4 km) bypass of Cape May Court House opened on July 29, 1951, from exit 12 to the point where the parkway directly parallels US 9 north of Burleigh.[18][19] However, due to a lack of funds, construction of the Route 4 Parkway stalled. The only segment to open was 1952, only the bypass of Toms River was opened on July 3.[20] The solution was for the state to establish the New Jersey Highway Authority (NJHA) in April 1952 to oversee construction and operation of the remainder of the parkway as a self-liquidating toll road from Cape May to the New York state line.[15][16][21] The parkway was extended north to Union Township on July 16, 1953.[22] On September 16, 1953, pedestrians were banned from the parkway in order to increase safety on the segment with at-grade intersections.[23]
Sections opened in quick succession in 1954; these were the first to be tolled. The first tolled segment was opened on January 13, 1954, from US 22 to Mill Road. Due to poor weather conditions, tolls were not collected until January 15.[24] The Toms River bypass was extended south to Manahawkin on July 15,[25] and north to the Eatontown Spur (now Route 36) on July 30, 1954.[26] The bridge carrying the parkway over the Raritan River was also opened to northbound traffic on this day,[27] extending the highway south to US 9 in Sayreville.[28] The southbound lanes were opened on the bridge south to Eatontown on August 4, and an extension to New Gretna opened the day after.[29] Closing the northbound gap from Eatontown to Sayreville on August 7 provided for 90 miles of unbroken highway.[30] Within Atlantic County, a large section from Tilton Road in Egg Harbor Township to the south bank of the Mullica River opened on August 11, though north of the White Horse Pike the road initially operated as a temporary super two on the southbound lanes[31] until August 21.[32] This was extended south to Somers Point on August 27 (again as a super-two before the northbound lanes opened on September 22[33]), then connected across the Mullica River to the existing section on August 28 over a temporary super-two,[34] with the other lanes opened a few weeks later. The Cape May section of highway was also extended north to Route 50 at Seaville that day,[35] which then was extended south to Route 47 on September 4,[36] and north to Beesley's Point Bridge on October 6. The entire highway south of Irvington was declared finished on October 9, 1954. The lone exception was across the Great Egg Harbor; the parkway temporarily detoured onto US 9 and over the Beesley's Point Bridge at this point.[37][38] Literature from the time suggested that the parkway would become toll-free once bonds used for its construction were paid off. However, this speculation never became a reality.[39]
Segments north of Irvington began opening in the months thereafter. The section from Irvington to Central Avenue in East Orange was scheduled to open on November 26, but complaints about the road's safety from Irvington officials stalled opening until December 9, after the erection of temporary fences along the road's length.[40] An extension north also proved tumultuous: though scheduled to open on January 4, the extension to North Arlington Avenue opened a day earlier than scheduled. Mayor William McConnell ordered a blockade on this section of the highway on January 4, stating that North Arlington Avenue would be unable to handle traffic coming from the parkway. It was only when the southbound section was opened to exit 148 on January 8 that the blockade was lifted on the southbound section.[41] At this point, Bloomfield mayor Donald E. Scott prevented the opening of the northbound lanes until the completion of a new bridge carrying Bloomfield Avenue over Second River needed to carry exiting traffic. Though this bridge was not completed for some time, the highway opened fully to US 46 on January 19, negating this prerequisite.[42] However, Mayor Scott still barred all entrances and exits except for the southbound entrance from Bloomfield Avenue, until an inspection proved the highway safe; the exits were finally opened on January 21.[43] During this conflict, the section from Route 3 to Hazel Street in Clifton opened on January 4. A similar blockade was threatened to be placed, but the announcement of speedy construction of fencing prevented this.[44] On May 10, 1955, legislation was passed that made it legal for emergency vehicles to not pay tolls when on duty.[45] The bridge over the Passaic River opened on May 26, 1955. This extended the parkway's northern terminus to US 46 in present-day Elmwood Park.[46] On July 1 of that year, the portion of the highway from US 46 to Route 17 in Paramus opened. In spring 1955, a widening project began between US 22 and the Raritan River bridge; this would expand the roadway from four to six lanes. It was completed on July 9 of that year.[47] In late 1955, construction of a northbound roadway began in Cape May. The new roadbed was opened north of Seaville by October 17, south of Cape May Court House by October 25, and fully by October 28.[48] On April 16, 1956, the parkway's trailblazer was posted.[49] The final stretch of permanent roadway was opened alongside the Great Egg Harbor Bridge,[50] completing the parkway as outlined in original plans.[49]
Soon after the parkway's opening, congestion on Route 17 increased substantially, prompting an extension of the parkway to Montvale, connecting to the newly-built New York State Thruway. By November 30, 1955, it had been determined that this extension was financially feasible. On January 18, 1956, the NJHA entered into an agreement with the New York State Thruway Authority (NYSTA) for the prompt, and coordinated plans for extension. The agreement was formally signed on February 1 by NJHA Chairwoman Katharine E. White and NYSTA Chairman Bertram D. Tallamy. Groundbreaking for the road began on May 1 of that year.[47] Unlike previous segments of the roadway, this one uses prestressed concrete for overpasses; this made correcting errors during construction or future demolition easier.[51] It was originally proposed as part of a northern extension of the unbuilt Route 101, a highway that was intended to run from Kearny to Hackensack. The extension, Route S101, would have continued northward from Hackensack to the state line via Paramus.[52] Approximately nine miles (14 km) in length, the extension was planned to run north through the Bergen County municipalities of Paramus, Washington Township, Hillsdale, Woodcliff Lake, and Montvale to the state line, where the parkway would meet with a connecting spur from the mainline of the New York State Thruway. Part of the extension to Chestnut Ridge opened on July 3, 1957,[53] and the Thruway's Garden State Parkway Connector opened on August 29 that year.[54] In only 36 hours, the extension reported 8,000 drivers.[55]
On February 7, 1958, U-turning was banned in order to increase safety. This was enforced at both the toll plazas and on the main roadway, and was considered a violation even if done to correct error.[56]
By the time the parkway had been extended to the New York State Thruway, the need for a full interchange at the exit 154 was noted. Following the recommendation of a survey to do so,[47] D. Louis Tonti, the executive director of the New Jersey Highway Authority, announced plans in December 1957 to construct two new overpasses at exit 154 in Clifton. These overpasses would connect drivers from US 46 eastbound to the parkway northbound, and from the parkway southbound to US 46 westbound. In May 1958, a bid of the project went to Thomas Nichol Company, Inc. of Farmingdale, and construction began immediately.[57] By August 1958, the piers for the new viaduct from US 46 eastbound to the parkway northbound were finishing up.[58] In September, the completed piers had roadway construction on top of them.[59] The new ramps opened on January 1, and the toll booths on the ramps opened the in February,[60] replacing the toll booths on the grounded ramps, which were later demolished.[61] The total cost of the project was $2.25 million,[62] which was half a million higher than the original estimate.[63] Dedication of the overpasses occurred on January 15, 1959, when the Highway Authority and several city officials attended a ceremony and a luncheon.[64] During 1959, traffic counts noted 1.5 million cars used the ramps.[65]
In June 1958, the southbound road between the exit 117 and the Asbury Park Toll Plaza was widened from two lanes to three lanes.[47] Additionally, that same summer, the Highway authority began enforcing the speed limit through use of radar.[66] On June 19, 1959, the northbound roadway equivalent was widened, completing the project.[47]
On December 30, 1959, exit 139B was opened. The ramp, which served the missing movements both exit 139 and exit 140 lacked, had cost $108,487 in state funds to construct.[67]
1960s
[edit]On February 1, 1961, the state banned motorcycles, scooters, and bicycles from the entire road. This ban was approved by the highway department's safety committee and state attorney for the toll-free segments and NJHA's safety committee for the tolled ones. This followed a year involving 20 motorcycle accidents that resulted in two fatalities. Motorists who were caught using these modes of transportation on the parkway faced either a fine of $200 or 30-day jail sentence.[68]
On December 5, 1962, a new ramp from exit 120 onto the northbound lanes opened to traffic, serving direct access to them without traveling through Cheesequake State Park.[69]
In March 1961, the Highway Authority announced that plans were being made to construct a new interchange at either Red Hill Road or Nutswamp Road.[70] By June, the Highway Authority announced that the interchange would be built at Red Hill Road.[71] In November, it was announced the exit would replace the free exit 116, though rather than being demolished, it would simply be restricted to emergency traffic.[72] Exit 114 would help relieve local congestion that traveled to the new Bell Labs Holmdel Complex and other industrial parks operating in the area.[73] On December 14, the Highway Authority made an appropriation of $50,000 for the engineering work on the interchange.[74] Construction began on the exit 114 ramps on July 30, 1962, when construction equipment was taken to the site.[75] The exit was opened to traffic on December 20, 1962.[76] with two toll facilities also being constructed. Exit 116 was closed as planned;[76] this was received negatively by locals.[77]
On June 18, 1963, a meeting was held between NJHA officials, Senator Charles W. Sandman Jr., and the Cape May County Board of Freeholders. They discussed safety issues found at exit 12;'s exit ramp. A northbound-only ramp that traveled at-grade across the southbound lanes; it had been described as a "serious hazard" by the NJHA's safety committee. After an agreement was settled on and approval came from the State Highway department, it was announced to the public on June 26 that the northbound ramp would close permanently. When this occurred on July 2, all northbound traffic that previously utilized the ramp was advised to use exit 13, only 0.5 miles (0.80 km) to the north, instead. The entrance onto the northbound lanes from US 9 was left unaltered.[78]
On July 31, 1964, a project to construct exit 38 was completed. The cloverleaf interchange, which costed $800,000,000[79] was built to serve as a link to the newly constructed Atlantic City Expressway.[80]
In May 1962, plans were announced to widen the segment from exit 154 to just near exit 158 from two lanes to three lanes.[81] As part of this, the Passaic River Bridge was to be reconstructed with a wider superstructure and piers. The Bergen Toll Plaza was also rebuilt to give each direction dedicated toll canopies instead of all traffic merging into a single canopy like previously. The project was completed in December 1963.[82] They also repaved a 2 mile segment of roadway from the Passaic County line to exit 154 in order to add a one inch overlay of asphalt. This project also entitled lengthening and widening northbound acceleration lanes to exit 153A, exit 153B, and the grounded ramp at exit 154. This part of the project began on August 1 and was completed by October 31.[83] Construction had also began on a new exit 159. This interchange would serve I-80 with direct connections, as well as Midland Avenue with indirect connections. In preparation of this, exit 158 was had its northbound exit and southbound entrance closed permanently on March 16, 1963,[84] with the remaining connections closed on June 22.[83] On December 23 of that year, the ramps onto Midland Avenue from exit 159 were opened to traffic. Tolling of the interchange began immediately.[82] However, the ramps to and from I-80 would not open until October 20, 1964. The project cost a total of $4,500,000.[85] In November of that year, the northbound exit and southbound entrance at exit 157 were permanently closed. This, was done to encourage use of exit 159.[86]
On March 8, 1965, a project began to improve the segment between the Cape May Toll Plaza and exit 30. It involved a major reconstruction of exits 29, replacing the at-grade intersection with a new grade separated northbound exit and southbound entrance. Exit 30 also had its northbound entrance and southbound exit closed and a toll plaza constructed. Additionally, the Great Egg Toll Plaza was replaced by a new, wider plaza north of the old one, and the Cape May toll plazas had two extra collection lanes constructed While initially planned for competition by July 1,[87] competition was delayed to July 15.[88]
In the mid-1960s, a project to reconstruct interchanges in Essex County was undertaken. On January 1, 1966, a project was completed that constructed longer deceleration lanes and widened the exit and entrance ramps of exits 148 and 144.[89] On January 10, tolling began on exit 148.[90] In December 1965, a related project began to reconstruct exit 143. It would contain a collector-distributor roadway. The project was completed on April 12, 1966,[91] exit 142 was then renumbered as exit 143 .[90] Additionally, in December 1965, plans were announced to replace exits 145. Unlike the old ramps, this new one would provide access to I-280. Also as part of this project, exit 146 would be demolished, and an overpass would be built to replace part of the depressed roadway. The exits 146 and 145 were permanently closed to traffic in late 1965. On January 12, 1966, the replacement exit 145 were opened to traffic, though the ramps onto I-280 at the latter remained barricaded off while the highway was still under construction. On October 13, 1967, the I-280 segment and its ramps were partially opened, completing the project.[92] These projects were carried out to reduce congestion, which had previously run rampant due to its interchanges being largely free of tolls.[93]
The Highway Authority rebuilt exit 4 into a full interchange, with new ramps being built and old ones being reconstructed to provide full connections.[94] The project, completed on May 24, 1968, also involved the construction of two new toll facilities.[88] In March of that year, construction also began on a new access road to the Garden State Arts Center at exit 116. It was completed in June of that year,[95] and on August 8, exit 116 was reopened with a new exit number.[96]
In May 1966, the borough of Paramus and the New Jersey Highway Authority announced plans to replace exit 165, as well as widening of the segment to three lanes. It would have involved construction of new overpasses and demolition of the old ones, including a new pedestrian overpass to serve a nearby school.[93] Costing $3.7 million (equivalent to $26.5 million in 2023[97]), Construction on the new complete interchange began almost immediately, with the new southbound ramps opening on November 30, 1966,[98] On December 29, the dual ramps on the northbound direction opened. On February 13, tolls went into effect on the Ridgewood Avenue intersection.[99] On January 6, 1967, exit 166 was closed to prevent traffic from traveling through them. The reasoning for this was that traffic heading onto them congested many of the local roads.[100] By September, it had been forcibly reopened after a gag order was secured to prevent local authorities from affecting parkway operations.[101] In early 1967, the parkway was widened from four lanes to six lanes between the Bergen Toll Plaza and exit 161 in Paramus. In 1968, the road was widened from four lanes to six lanes between exit 163 and exit 165. In early 1969, the roadway was widened between exit 163 and exit 161. These widenings made the entire 80-mile (130 km) stretch from Ocean County to Paramus at least six lanes wide.[102] When the parkway was opened through Clifton in 1955, a spur was supposed to open south of its exit to Broad Street at exit 155P.[103] However, by 1965, no other construction had occurred, and the parkway's spur had been canceled. Because of this, in 1967, work began on a project to construct the remaining ramps at exit 155P (now exit 155A); instead of serving as a spur of the parkway, they would serve Route 20 (now Route 19) instead.[104] The ramps were opened to traffic on October 20, 1969.[105]
1970s
[edit]In 1972, the dualization of the Great Egg Harbor Bridge eliminated the final two-lane segment of the parkway.[106] On September 18, 1969, a new exit 129 were opened,[107] the remaining ramps were opened to traffic by early 1970. This replaced the existing interchange, and made it so that the turnpike had direct connections to both directions and vice versa. On November 24, 1970, southbound parkway traffic from there south to the Raritan River was redirected onto a new roadway that lied in the median of the old one, the old were not demolished however, but rather became an exit onto US 9, effectively creating a collector-distributor road.[108] This bypass effectively eliminated the two former exits, while these still exist, they are now Route 9 exits.[109] On August 17, 1971, the same switch occurred to the northbound roadway, the old one also became a collector-distributor road, though it rather served as a US 9 ramp to connect to the northbound GSP as well as the New Jersey Turnpike.[110]
An expansion of the Driscoll Bridge across the Raritan River was completed on September 2, 1971.[111] Work then began on widening the Sayerville side and repairing and widening the existing part of the bridge deck, work was completed by beginning of 1972.[112] On January 17, 1973, exit 127 was opened to Route 440 south.[113] By June, the link to Route 440 north had opened.[114] In May 1973, exit 98 was opened to northbound traffic. On July 3, 1973, the southbound exit 98 opened, completing the project. this exit replaced the preexisting exits 96, 97, and 97A, with the new exit featuring a right hand collector-distributor roadway combining the cloverleafs at exits 97 and 97A as well as the left-hand ramp at exits 97,[115][116] which had its southbound ramp closed on July 1, 1973.[117]
The speed limit was raised from 50 to 55 miles per hour (80 to 89 km/h) on January 3, 1974.[118] Additionally, on February 21 of that year, a project to rebuild exit 91 to increase safety was completed, as part of this project, the at-grae intersection as toll plazas were constructed.[119] On February 27, 1974, exit 117A (now exit 118) opened to the public; a temporary northbound ramp was opened while exit 117 was reconstructed into a right side exit.[119] This was completed later that year, the new exit 117 as well as the southbound exit 117A were tolled, unlike their original equivalents. On July 2, 1973, southbound traffic heading onto exit 105 was redirected onto a new right hand ramp, and the left-hand ramp was permanently closed.[115][116] In mid 1974, construction began on new express roadways in the median thorough Monmouth County; it was two lanes wide in each direction, and had much fewer exits than the local roadway. The segment from Sayerville to Keyport was opened on July 3.[120] Alongside this project came new ramps onto exit 105. The segment of roadway from Keyport to the Tinton Falls toll plaza was opened on August 2 of that year.[120] Alongside this segment came new ramps at exit 117.
On November 1, 1975, motorcycles were relegalized after over 14 years of protest from motorcyclists; all of the other restrictions remained.[121][122] Particular pushback was made by Malcolm Forbes,[123] who filed two lawsuits to stop this ban.[citation needed] On April 14, 1976, exits 142 was opened to traffic.[124] This interchange constructed by the highway department was first proposed in 1966.[125] The parkway was planned to have a interchange with Route 55 constructed at milepost 19. This was canceled in 1975 after the conclusion that the highway ran through too many wetland areas.[126] The idea has since been revisited after frequent traffic jams on Route 47.[127][128] The parkway was also planned to be the southern terminus of the unbuilt Driscoll Expressway, a 38-mile (61 km) toll road that was planned in the early 1970s to run from Toms River to the New Jersey Turnpike in South Brunswick; this plan was abandoned in 1977.[129]
1980s
[edit]In 1979, proposals for an exit at milepost 124 were proposed; in 1980 construction of this interchange became a priority.[130] In March of that year, Hardroads Inc., a firm located in East Brunswick, was hired to construct this new interchange.[131] They quickly acquired land for the interchage, and construction began shortly after.[132] On October 25, 1982, this exit was partially opened to traffic.[133] Later, on November 19, the final part of the ramp was completed.[134] In 1980, plans was proposed to construct exit 84, which would have consisted of a southbound exit and northbound entrance onto Indian Head Road.[135] They also would have widened the New Gretna Toll Plaza. [136] However, it was declared unbeneficial after a study deemed it to likely discourage use of public transit,[136] and despite a replanning of the interchange,[135] it was later shelved indefinitely. Additionally, in 1983, plans were made to reopen exit 116 as a tolled interchange. However, they ended up unsuccessful after protest from Homdel officials.[137]
In 1980, plans were made to construct exit 171, which would serve the boom of office complexes replacing farmland across Chestnut Ridge road. In March 1985, the entrance leading onto the southbound parkway was opened, with the exit ramp opening on July 25 of that year.[138] In 1973, plans were made to widen a 3.1-mile (5.0 km) segment in Toms River. While this widening was planned to be completed by 1975,[139] however, its competition was delayed to 1978.[140] By 1979, work on the Toms River segment was completed, at this point the project transitioned to widening the segment between the Asbury Park toll plaza and exit 100 from two to four lanes, as well reconstructing exits 102, and widening the segment in Lakewood from two lanes to three lanes.[141] On November 17, 1980,[142] the road was widened from three to four lanes between exits 129 and exits 141.[143] These new lanes were HOV lanes that were restricted to vehicles with three or more occupants, though this was later lowered to two or more occupants in June 1981. They were converted into general use lanes in 1982 after almost universal criticism.[144] In late 1983, a project to widen the segment of roadway near the Raritan Toll Plaza from five to six lanes began. The entire project was completed by 1984.[145] Work on the rest of the project was completed at the end of 1985. Also as part of this project the Asbury Park and Union toll plaza were reconstructed with dedicated canopies in each direction.[146] This project made it so that the entire segment between Woodbridge and East Orange was at least four lanes wide.[147]
On November 19, 1986, exit 131B was opened to traffic. The interchange, which was constructed as part of a related upgrade to Metropark station, cost $4.4 million to construct.[148] In 1987, the NJHA purchased the 19 miles (31 km) of road that had been constructed by what is now the New Jersey Department of Transportation. These state-maintained segments were located in Cape May County between exits 6 and exits 12, in Ocean County between exit 80 and exit 83, and between exit 129 and exit 140. NJDOT sold the sections for one dollar with the requirement that tolls were never to be charged on them.[149] That same year, the roadway between mileposts 99.5 and 83.5 was restriped from two lanes with a shoulder to three lanes with no shoulder.[150] In December 1986, a new right hand ramp at exit 100 was opened, the existing the left-hand one was then closed permanently.[151] Work also began in March 1987, to construct new overpasses, implode the existing ones, replacing lighting and signage, reconstructing the unaltered exits to meet with the new overpasses, and widening the parkway in the area from four lanes to six lanes. Work on the project was fully complete by December 1987.[152] In 1988, the northbound exit 105 ramp was reconstructed, a new new loop ramp was built to feed onto NJ route 18 northbound was built, and the existing deceleration lane was replaced by a new one. In addition, an on-ramp was built that allows southbound Route 18 traffic to enter the southbound local roadway.[153]
1990s
[edit]In 1994, a third lane was added to the segment between mileposts 81 and 82.[147] The Highway Authority rebuilt exit 74. In addition to the construction of toll plazas in both directions, other alterations were made, such as demolishing the southbound entrance and exit ramps and constructing new ones to turn around at where the southbound entrance once was, thus eliminating the traffic signal that existed prior. This was completed on November 20, 1996, though at the cost of $4.4 million.[154] In April 1997, plans to construct an jughandle overpass from southbound exits 159 onto eastbound I-80 were made. Also as part of this, new traffic signals would be installed at the Midland avenue ramps, and its overpass crossing the parkway would be reconstructed to be wider.[155] Work on this project began immediately, and the ramp was opened to traffic in January 1998, six months ahead of schedule. Despite the fact it was not designed with it in mind, the overpass carrying I-80 traffic was not rebuilt, instead, a retaining wall was constructed instead[156]
On April 1, 1998, a project to construct a new northbound ramp to Lomell lane at exit 83 was completed. Later that year, a traffic signal was installed at exit 81, in addition to other safety improvements.[157] Later that year, large portions of the roadway had their speed limit increased to 65 miles per hour (105 km/h).[158] In June 1999, a project to expand the Barnegat toll plaza was completed and with it eliminated the final single canopied mainline plaza. Also included in this project was new fencing, new electrical work, increased landscaping, and a toll re-coordinating shed.[159] E-ZPass was first installed at the Pascack Valley Toll Plaza in December 1999,[160][161] with the Raritan Toll plaza following in April 2000.[162] By August, installation of the system had been fully completed.[160][161]
2000s
[edit]In April 2001, a project to replace the Dover Road overpass to allow for improvements to said road was completed.[163] Later that year, a law was also passed that required tolls to be kept as long as there are construction projects occurring,[164] effectively shooting down any proposals to de-toll the tolled segments.
On July 9, 2003, Governor Jim McGreevey's plan to disband the New Jersey Highway Authority and give control of the parkway to the New Jersey Turnpike Authority (NJTA) was completed.[165] Additionally, in November of that year, construction was completed on the $16.23 million exit 89, a new southbound exit and northbound entrance in Lakewood. This new exit featured a toll facility, and was located in the same general area as exit 88. Due to featuring collector-distributor lanes, the Cedar Bridge Road bridge had to be demolished and a replacement with a wider superstructure built in its place.[166]
In 2005, the entrance and exit at exit 123 were both widened from one lane to two lanes, a southbound entrance was constructed at exit 131, and missing links were constructed at exit 114 as well as exit 13.[167]
In 2006, exit 77, an entirely new interchange, was opened to traffic. The interchange, which had the northbound and southbound ramps constructed 1⁄2 mile (0.80 km) away from each other to avoid demolition of the nearby Double Trouble State Park, contains one toll facility in each direction.[citation needed] Later that year, a project was also completed that rebuilt the overpass carrying NJ 138 eastbound over the Parkway.[168] This allowed the roadway underneath it to be widened from three to four lanes, as well as eliminating a curve the old overpass contained.[citation needed]
In March 2007, a project to reconstruct exit 69 was completed. New ramps were built, and the existing ones were demolished. Unlike them, the new ramps had full connections; the new ones were also tolled, with two plazas being built on each side. This also came with replacement of the overpass carrying traffic over the parkway with a longer one.[169]
In September 2006, construction began on improvements to exit 145.[170] This project, which replaced the ramps with longer and wider ones as well as building new EZ-Pass lanes at the ramps toll plaza, was completed in November 2007 at the price of $11 million, and was completed three years ahead of schedule.[168]
In October 2007, a project to improve exit 135 began. It was completed circa May 2008.[171]
In 2001, plans to reconstruct exit 63 and add missing connections were announced.[172] This project was completed in late 2008. That same year, the speed limit was reverted to 55 miles per hour (89 km/h) between mileposts 80 and 100 in order to reduce accidents.[168]
On September 25, 2002, construction began on a new span of the Driscoll Bridge just west of the original spans, consisting of seven lanes and emergency shoulders. On May 3, 2006, all traffic was shifted onto the new span, and the original was closed for superstructure replacement.[173] On May 20, 2009, all northbound traffic was shifted back onto the original spans, and the new one was made exclusively for southbound traffic.[174]
To reduce congestion, 10 of the 11 toll plazas on the roadway were converted into one-way plazas between 2004 and 2010. The Cape May (in Upper Township), Great Egg (in Somers Point), New Gretna (in Bass River Township), Barnegat (in Barnegat Township), Asbury Park (in Tinton Falls), Raritan (in Sayreville), Union (in Hillside), Essex (in Bloomfield), Bergen (in Saddle Brook), and Pascack Valley (in Washington Township) toll plazas were among these.[175] The tolls at these plazas were doubled upon conversion. The Toms River Toll Plaza (in Toms River) is the only location on the parkway mainline where a toll is still collected in both directions.[176]
In April 2008, a $150 million project began to construct new overpasses at exit 142. In its 1976 configuration, the parkway northbound did not have a ramp to I-78 westbound, and the parkway southbound did not have an exit to I-78 eastbound. The lack of connections was due to the cancellation of the extension of I-278 (which would have connected northbound parkway traffic with I-78 westbound) and Route 75 (which would have connected southbound parkway traffic with I-78 eastbound via I-280) in the early 1980s.[177] The New Jersey Department of Transportation (NJDOT) awarded the project contract to the engineering firm Gannett Fleming for the design, and to Union Paving & Construction Company for building the ramps.[178] The ramp connecting the parkway northbound with I-78 westbound opened on September 16, 2009, with a ribbon cutting ceremony led by Governor Jon Corzine.[179] The ramp connecting the parkway southbound with I-78 eastbound opened on December 10, 2010.[178]
2010s
[edit]In April 2011, New Jersey Transportation Commissioner James Simpson announced the NJTA was considering allowing trucks on the northern portion of the Garden State Parkway.[180] However, the idea was quickly abandoned after the agency found the road had engineering concerns that would not accommodate trucks on this segment.[181]
A project that rebuilt the Watchung Avenue overpass at exit 151 in order to add shoulders to the segment underneath and increased safety by being wider and more friendly to pedestrians[182] was completed in 2013. Additionally, both existing ramps were widened from two lanes to three lanes, and both of the entrance ramps onto the Parkway were entirely rebuilt.[citation needed]
On July 22, 2014, the NJTA filed a federal lawsuit against Jersey Boardwalk Pizza, a pizza chain in Florida, for using a logo too similar to the Garden State Parkway's trailblazer.[183] Federal Judge William Martini dismissed the suit on March 26, 2015.[184][185]
As originally built, in Cape May County, the parkway had three at-grade intersections (at exits 9, 10, and 11), but a project to eliminate began in early 2013, when construction began on three overpasses in Cape May Court House.[186] The plan was delayed because it had not been approved by the federal government. The $125 million project was largely complete by September 2015, with the Mechanic Street interchange also being closed around this time.[187]
On September 5, 2016, a project to rebuild exit 0 was completed. It involved constructing a new ramp from NJ 109 southbound onto the parkway northbound, relocating the ramp itself onto a new, shorter alignment, and reconfiguring the traffic signal with pedestrian crosswalks and other safety features.[188]
In 2012, a project to reconstruct the roadway between mileposts 83 and 100 in order to add shoulders was started.[189] On November 9, 2014, exit 88 was permanently closed.[190] On June 11, 2015, the northbound replacement exit 89 were opened to traffic.[191] It was completed in May 2017, when the reconstruction of exits 91 into a full interchange was completed,[192] ten months behind schedule[193] because the legislature failed to raise the state's gas tax.[194]
In April 2014, a $68 million project to eliminate the left-hand ramps at exit 163 began. Due to this, a half mile stretch of the GSP mainline was shifted towards the median, with the existing ramps retained but now passing under the Parkway and joining it from the right. This major project was completed in September 2017, with minor work continuing into mid-October.[195]
In 2012, the improvement of exit 105 southbound at the intersection with NJ route 36 on the local lanes was proposed.[196] It involved replacing the single-lane ramp which provided access to Route 36 with a new one. This ramp would have two lanes and a wider shoulder, and would also provide access to Route 18 via Wayside road. Additionally, the northbound ramp onto route 36 would be constructed, as opposed to locating traffic onto route 36, it would instead carry traffic into an intersection with Wayside Road .[197] Also, in both directions, the deceleration lanes were increased in length and widened to two lanes in addition to lighting improvements and replacing the underhead signage southbound with new overhead ones, and replacing the sign heads northbound. Construction began in 2013, and was completed by the end of 2017.[198]
In May 2005, Governor Richard Codey announced plans for a widening of the parkway between exit 63 in Stafford Township and exit 80 in the borough of South Toms River from two to three lanes in both directions. However, the NJTA later made plans to widen the parkway from exit 80 all the way south to exit 30 in Somers Point. In 2008, planning began on a project to construct a southbound entrance and northbound exit at exit 67. By March 27, it was revealed that the new ramps would not be tolled. Construction began in the summer of 2008. While initially planned for completion on May 20, 2009,[199] it was ultimately completed in October 2010.[200] The project was divided into three phases. The first of these, the one from exits 80 to 63, was completed in may 2011.[201] In November 2014, a widening project was completed between exits 63 and 48.[202] Exit 41 was opened on March 13, 2015.[203] Previously, drivers who wanted to go to Jimmie Leeds Road had to cut through the parking lot of the Atlantic City Service area, though they still can,[203] however the traffic light that previously existed was eliminated.[204] In August 2015, a project which constructed missing movements at exits 44 was completed.[citation needed] In June 2017, three projects to improve exits 36, 37, and 38 were completed.[205] A new ramp was built at exit 38 order to reduce unsafe weaving, exit 37 had its deceleration lane reconstructed to be longer, and exit 36 was rebuilt to eliminate its stop-and-go pattern.[206] In 2018, a widening from exits 48 to milepost 30 was completed, it included reconstruction of overpasses, and the opening of new bridges across the Mullica River from Port Republic to Bass River, after which point the older ones had their superstructures replaced.[207]
The southbound bridge over the Great Egg Harbor Bay was replaced with a wider span parallel to the older span as part of a $79.3 million project. Construction began in 2013. The new bridge was opened in 2016, the old one was then permanently closed. While the northbound bridge was kept open briefly, all traffic was moved onto it in 2017 so the old bridge could be demolished and the northbound span could undergo strengthening and a superstructure replacement. Work on the project was considered mostly complete by October 2019.[208]
In April 2016, a project to reconstruct exits 125 into a full interchange commenced. A new southbound exit would be tolled and made exclusively for E-ZPass users; no toll would be added to the new northbound entrance. Also involved in this project was the replacement of the overpasses that carried the parkway over Chevalier Avenue with wider structures, adding a alternate ramp onto Main Street, and constructing a new southbound entrance ramp and demolishing the existing one–this would provide greater access to a new shopping mall in the vicinity that is yet to be completed.[209] It was completed in February 2020.[citation needed]
In 2018, planning began for a improvement project at the northbound ramps at exits 109.[210] The project involved partly winding the ramp and constructing a new ramp to directly allow access to the Lincroft park and ride from the parkway and to allow easier access to Newman Spring Road eastbound. Improvements were also made to the ramps onto the parkway from County Route 520. These include a ramp and overpass being built on Newman Spring Road eastbound, the addition of a traffic light at Schulz Dr, the removal of the U-turn ramp to Half Mile Road and the addition of a left turn signal at the junction to compassionate. Bidding for the project was completed in July 2018, and construction began shortly after. It was completed in May 2020.[211]
In June 2018, an improvement project began at the interchange with I-280 and CR 508 (Central Avenue). The project involved widening the entrance ramp to the parkway southbound from one to two lanes and adding a second deceleration lane on the parkway northbound. Due to the addition of the deceleration lane to South Grove St, the northbound toll plaza on the exit was completely removed starting on July 26, 2018, at 10 pm.[212] To accommodate the wider roadway, the overpass carrying Central Avenue over the parkway was also rebuilt.[207] Five nearby bridges were also rehabilitated as part of the project. The project cost approximately $63 million and was completed in August 2022.[213][214]
2020s
[edit]On March 24, 2020, the NJTA temporarily suspended cash toll collection due to the COVID-19 pandemic. Drivers without E-ZPass transponders had their license plates photographed at the toll plazas and were sent bills in the mail. Cash collection resumed on May 19 of that year.[215] Also around this time, a new high speed toll gantry was completed at the New Gretna Toll Plaza.
In March 2022, exit 105 was closed in multiple stages so that five of the overpasses, of which some date back to 1954 and others to 1974, could be replaced.[216] The project was completed in late 2023.[217] Additionally a temporary crossover was built at mile marker 108.5 that lasted from March 2023 to February 2024.
In 2020, a project that involved making multiple improvements between mileposts 140 and 143 was commenced. It involves repaving the road, adding new lighting, and constructing a median barrier. It also systematically replaces multiple bridges in between the mile markers, including two that carry traffic over US 22 and one that carries traffic over NJ 82.[218] It is scheduled to be completed at the end of 2024.
On February 23, 2023, the overpass carrying exit 156 were was temporarily closed to traffic[219] this was because the ramp was in the way of construction on the Passaic River Bridge and needed a retaining wall to be constructed in order to minimize disruption to local communities. This was completed on July 15, and is part of a greater project to reconstruct the Passaic River Bridge, the current superstructure considered functionally obsolete and structurally deficient, in addition to not meeting the greater standards of the New Jersey turnpike Authority. Work on that part of the project is scheduled for competition in fall 2025.[220]
Future
[edit]There are currently plans to rebuild the segment of road between exits 80 and 83. This segment of road lacks shoulders and other safety features, and only exit 82 is a full interchange.[221]
In 2020, the NJTA announced plans to reconstruct exit 29 into a full interchange. This was due to the fact that exit 30, which carries traffic onto the residential street West Laurel Drive, sees chronic congestion during the summer tourist season as it connects to New Jersey Route 52 via an intersection with US 9. If this plan where to go thorough, then the exit 30 would have been demolished, meaning that summer traffic would have had to travel to CR 559 via US 9 to reach the road. This proposition was heavily criticized by officials and residents in Somers Point and Ocean City, fearing that traffic congestion would simply be relocated rather than eliminated,[222] as well as reduceing business that relies on the interchange.[223] They also announced plans to improve other interchanges, such as exits 6, 13, 17, 20, 40, 123, 124, 147, 153, and 168. These upgrades were suggested either to provide full connections or to improve safety by eliminating obsolete designs such as left hand exits or short deacceleration lanes, as well as to increase future capacity.[224] The turnpike authority also has long-term plans to widen the parkway between exit 98 and exit 125, as well as between exit 142[225] and exit 163, and exit 129 and 142.[224] However, opponents to this project have proposed instead to construct light rail in between the median.[226][227]
Tolls
[edit]The Garden State Parkway uses an open system of tolling in which flat-rate tolls are collected at numerous toll plazas placed along the mainline and at certain interchanges. This contrasts with the New Jersey Turnpike, which uses a closed system in which a motorist receives a ticket with the toll rates at the highway's entrance, and turns in the ticket along with the toll upon exiting at toll gates. Tolls can be paid by using cash or the E-ZPass electronic toll collection system.[228]
As of March 1, 2024, the standard car toll is $1.10 for cash and $1.05 for E-ZPass on the main road at two-way toll plazas and $2.20 for cash and $2.09 for E-ZPass at one-way toll plazas. Some entrances and exits require a toll of either $0.80, $1.10, $1.55, or $2.20 for cash and $0.73, $1.05, $1.45, or $2.09 for E-ZPass.[176][229] Additional E-ZPass discounts are available for off-peak travel, senior citizens, drivers of green vehicles, and trailers.[228]
There are three different lane types at the toll plazas. However, not all plazas have every type of lane at all times.[203]
The first type is full-service lanes. These lanes are staffed and toll collectors can provide change and receipts to drivers.[230]
The second type is exact-change lanes. In these lanes, motorists deposit coins in a toll basket and each coin is mechanically counted; historically, these lanes also accepted tokens.[231] Payment of tolls in exact-change lanes has been enforced by photo since 2011.[232] The Union Toll Plaza was the first to use an automated toll-collection machine; a plaque commemorating this event includes the first quarter collected at its toll booths.[233] As of 2018, exact-change lanes are only used for exit and entrance ramp toll plazas.[234]
The third type of lane is dedicated for vehicles with E-ZPass tags. Some plazas also feature Express E-ZPass lanes, allowing drivers to bypass the toll plaza at highway speeds.[235] E-ZPass is also accepted in full-service lanes.[236] Express E-ZPass lanes operate at the Pascack Valley, Raritan, Asbury Park, Toms River, Barnegat, New Gretna and Cape May Toll Plazas.
Tokens, available for purchase at full-service toll plaza lanes, were introduced in 1981 at a price of $10 for a roll of 40 tokens; as the toll was $0.25 at the time, most drivers continued to use quarters. However, when the toll was increased to $0.35 in 1989, rolls were priced at 30 tokens for $10; between the slight discount and the convenience of using a single coin, tokens gained in popularity.[231] Additionally, in August of that year, the highway authority installed token only lanes, though it was quickly realized this did not reduce congestion.[237] There were also larger bus tokens, primarily for use by Atlantic City-bound buses.[238] As E-ZPass became more widespread, tokens were phased out. Token sales were discontinued on January 1, 2002,[231] and they were no longer accepted effective January 1, 2009.[39]
On September 27, 2022, the NJTA awarded a $914 million contract to TransCore to convert the parkway into an all-electronic toll road, eliminating the toll booths in the process. Although the agreement has been made, the Turnpike Authority has no set date on when the conversion will be completed.[239]
Services
[edit]Service areas
[edit]All service areas are located in the center median, unless otherwise noted.
Name | Location | mi[1] | km | Direction | Facilities | Notes |
---|---|---|---|---|---|---|
Bruce Willis (formerly Ocean View and originally Seaville) |
Dennis Township | 18.3 | 29.5 | Both | Convenience store, restrooms, fuel, vending machines, and tourist information | Rebuilt from 2013 to Spring/Summer 2014 |
New Gretna (Temporary, demolished) |
Bass River | 53 | 85 | Both | Food, restrooms, fuel | Closed on July 1, 1955,[240] when the permanent service areas were completed. Now site of a Parkway maintenance facility. |
Frank Sinatra (formerly Atlantic) |
Galloway Township | 41.4 | 66.6 | Both | Food, restrooms, fuel, and information | Rebuilt from 2014 to spring 2015 |
Celia Cruz (formerly Forked River) |
Lacey Township | 76.0 | 122.3 | Both | Food, restrooms, and fuel | Rebuilt from fall 2019 to summer 2020 |
Judy Blume (formerly Monmouth) |
Wall Township | 100.4 | 161.6 | Both | Food, restrooms, and fuel | Rebuilt from fall 2018 to spring 2019 |
Eatontown | Tinton Falls | 107 | 172 | Both | Food, restrooms, and fuel | Closed on July 1, 1955,[240] when a permeant facility was opened. Now site of a maintenance facility. |
Jon Bon Jovi (formerly Cheesequake) |
Sayreville | 124.0 | 199.6 | Both | Food, restrooms, and fuel | |
Colonia South | Woodbridge | 132.79 | 213.70 | Southbound | Fuel, convenience stores, and restrooms | Not operated by NJTA |
Colonia North | 133.45 | 214.77 | Northbound | Fuel, convenience stores, and restrooms | Not operated by NJTA | |
Whitney Houston (formerly Vaux Hall) |
Union | 142.0 | 228.5 | Northbound | Food, restrooms and fuel | Rebuilt from 2022 to 2023[241] |
Connie Chung (formerly Brookdale South) |
Bloomfield | 153.3 | 246.7 | Southbound | Food, restrooms and fuel | Rebuilt from 2022 to 2023[242] |
Larry Doby (formerly Brookdale North) |
153 | 246 | Northbound | Fuel and convenience store | Rebuilt in 2019 | |
James Gandolfini (formerly Montvale) |
Montvale | 171 | 275 | Both | Food, restrooms, fuel, and information | Renovations began in 2024[243] |
In the 1950s, four petroleum companies were hired to provide gasoline and vehicular necessities—Esso, Texaco, Atlantic, and Cities Service. The Cities Service company was the petroleum provider at Monmouth, Forked River, Atlantic City (Absecon at the time) and Ocean View (Seaville at the time) and offered a service where female employees were hired for those service area showrooms, wore uniforms and were known as the Park-ettes. Their duties included providing directions and other information to motorists as well as rendering odd bits of service such as sewing a missing button on a patron's coat.[244]
On July 27, 2021, the NJTA unanimously voted in favor of renaming the service areas along the Garden State Parkway after New Jerseyans who were inducted into the New Jersey Hall of Fame.[245][246] The Ocean View service area was originally slated to be named after Toni Morrison, but the NJTA never received written consents and releases; this prompted the New Jersey Hall of Fame to request the service area be named after Bruce Willis instead.[247]
On January 2, 2022, two service areas that were operated by McDonald's in Brookdale and Union were closed after their contract expired in 2021. These services areas were replaced by 2023.[248]
Picnic areas
[edit]One of the objectives of the parkway was to become a state park its entire length, and its users would enjoy park-like aesthetics with minimal intrusion of urban scenery. Along the ride, users were permitted to stop and picnic along the roadway to further enjoy the relaxation qualities the parkway had to offer. All picnic areas had tall trees that provided shade and visual isolation from the roadway. Grills, benches, running water, and restrooms were provided. Over time as the parkway transformed into a road of commerce, the picnic areas were closed for a variety of reasons. Their ramp terminals became insufficient to accommodate the high-speed mainline traffic and in addition to the decreasing number of users, the picnic areas were becoming more effective as maintenance yards and were converted as such or closed altogether.[249]
The one remaining picnic area, John B. Townsend Shoemaker Holly in Upper Township, is closed from dusk to dawn. Posted signs within the picnic area prohibit fires and camping.[249]
There were ten operational picnic areas:
Name | Location | Mile[1] | km | Direction | Opened | Closed | Notes |
---|---|---|---|---|---|---|---|
John B. Townsend Shoemaker Holly | Upper Township | 22.7 | 36.5 | Both | October 20, 1965[250] | — | John B. Townsend was a physician from Ocean City who became the New Jersey Highway Authority's second Vice Chairman in 1955. The word Shoemaker comes from the last name of the landowner in the way of the parkway's alignment during its initial construction. The term Holly comes from the holly tree that was on Shoemaker's property. The tree is presumed to be 300 years old and one of, if not, the oldest holly tree in the United States. The bathrooms at Shoemaker Holly were demolished in August 2014.[251] |
Stafford Forge | Stafford Township | 61.6 | 99.1 | Both | May 27, 1955[46] | 1990s[249][252] | |
Oyster Creek | Lacey Township | 71.3 | 114.7 | Both | May 27, 1955[46] | 1980s[249][253] | The murder of Maria Marshall orchestrated by her husband Robert O. Marshall occurred in the Oyster Creek picnic area on the night of September 7, 1984.[254] The story was made into a novel and television miniseries on NBC. |
Double Trouble | Beachwood | 79.0 | 127.1 | Southbound | June 1955[255] | February 23, 1961[256] | The NJHA chose to abandon the picnic area due to the outbreak of mosquitoes from a nearby cranberry bog.[256] |
Polhemus Creek | Toms River | 82.0 | 132.0 | Northbound | June 4, 1955[255] | 1980s–1990s[249] | |
Herbertsville | Wall Township | 94.6 | 152.2 | Southbound | May 27, 1955[46] | 1980s[249] | Converted to a maintenance yard of the same name and heavy vehicle weigh station. |
Telegraph Hill | Holmdel | 115.8 | 186.4 | Both | April 24, 1957[257] | 2010s[249] | The picnic area was off exit 116, next to the PNC Bank Arts Center. |
Glenside | Woodbridge | 130.2 | 209.5 | Southbound | October 23, 1987[253] | Closed due to illegal use for sex and drugs.[253] | |
Madison Hill | Clark | 134.9 | 217.1 | Northbound | November 1, 1950[16] | 1980s–1990s[249] | Madison Hill was an overlook constructed as part of the original Route 4 Parkway.[16] |
Tall Oaks | Clark | 137.0 | 220.5 | Southbound | July 1988[258] | Closed due to illegal use for sex and drugs;[258] converted to maintenance yard[249] |
Emergency assistance
[edit]On the Garden State Parkway, the emergency assistance number is #GSP, which is #477 in number form. Towing and roadside assistance are provided from authorized garages. The New Jersey State Police is the primary police agency that handles calls for service on the parkway.[259] New Jersey State Police Troop D serves the Garden State Parkway, with stations in Galloway, Holmdel, and Bloomfield.[260] Other emergency services such as fire and first aid are usually handled by the jurisdictions in which that section of the parkway passes.[259]
Exit list
[edit]The parkway was the first highway in the United States to use mileage-based exit numbers.[261] Historically, the exit numbers on the northbound and southbound roadways were not symmetrical. The New Jersey Highway Authority considered each as a separate road and as a result, many exits had non-matching numbers.[91]
County | Location | mi[1] | km | Old exit | New exit | Destinations | Notes[262] |
---|---|---|---|---|---|---|---|
Cape May | Lower Township | 0.00 | 0.00 | – | Route 109 south – Cape May | Southern terminus; at-grade intersection | |
0 | Route 109 north to US 9 – North Cape May | Southbound exit and northbound entrance; to Cape May–Lewes Ferry | |||||
Middle Township | 3.90 | 6.28 | 4 | Route 47 – Wildwood, Wildwood Crest, Rio Grande | Tolled northbound exit and southbound entrance; signed as exits 4A (south) and 4B (north) southbound; signed for The Wildwoods northbound, Wildwood/Wildwood Crest southbound | ||
6.54 | 10.53 | 6 | Route 147 – North Wildwood, Whitesboro | Southbound exit and northbound entrance | |||
8.40 | 13.52 | 9 | US 9 / Shell Bay Avenue | Former at-grade intersection | |||
9.90 | 15.93 | 10 | Cape May Court House, Stone Harbor | Access via CR 657; former at-grade intersection | |||
11.04 | 17.77 | 11 | Crest Haven Road (CR 609) to US 9 | No northbound entrance; former at-grade intersection | |||
11.80 | 18.99 | Crest Haven Road (CR 609) | Northbound entrance only | ||||
US 9 | Southbound entrance only | ||||||
13.60 | 21.89 | 13 | To US 9 – Swainton, Avalon | Access via CR 601; southbound left entrance | |||
Dennis Township | 17.50 | 28.16 | 17 | Sea Isle City, Dennis Township | Southbound exit and northbound entrance; access via CR 625 | ||
Upper Township | 19.38 | 31.19 | Cape May Toll Plaza (northbound) | ||||
20.25 | 32.59 | 20 | US 9 / Route 50 north – Upper Township | Northbound left exit and southbound entrance; southern terminus of Route 50 | |||
25.34 | 40.78 | 25 | US 9 south – Ocean City | Southern terminus of the concurrency with US 9; access via CR 623; serves Corson's Inlet State Park | |||
Great Egg Harbor Bay | 27.77 | 44.69 | Great Egg Harbor Bridge | ||||
Atlantic | Somers Point | 28.78 | 46.32 | Great Egg Toll Plaza (southbound) | |||
28.90 | 46.51 | 29 | US 9 north – Somers Point, Ocean City | Northern terminus of the concurrency with US 9; northbound exit and southbound entrance | |||
30.00 | 48.28 | 30 | Somers Point, Ocean City | Southbound exit (tolled) and northbound entrance; access via West Laurel Drive | |||
Egg Harbor Township | 35.82 | 57.65 | 36 | US 40 / US 322 – Northfield, Pleasantville | Northbound exit and southbound entrance; access via CR 563 / CR 651 | ||
36.08 | 58.07 | CR 563 – Northfield, Margate City | Southbound exit and northbound entrance | ||||
36.59 | 58.89 | 37 | To US 40 / US 322 – Pleasantville | Southbound exit and northbound entrance; access via CR 608; to CR 563 | |||
37.23 | 59.92 | 38 | A.C. Expressway – Atlantic City, Camden | Signed as exits 38A (east) and 38B (west); exits 7S-N on Atlantic City Expressway | |||
Galloway Township | 40.04 | 64.44 | 40 | US 30 east – Absecon, Atlantic City | Southbound exit and northbound entrance | ||
41.70 | 67.11 | 41 | CR 561 – Pomona, Galloway | Pomona not signed southbound | |||
43.98 | 70.78 | 44 | CR 575 / CR 561 Alt. – Port Republic, Smithville, Pomona | Signed for Port Republic/Smithville northbound, Pomona southbound | |||
Port Republic | 48.29 | 77.72 | 48 | US 9 south – Port Republic, Smithville | Southern terminus of the concurrency with US 9; southbound exit and northbound entrance | ||
Burlington | Bass River Township | 50.67 | 81.55 | 50 | US 9 north – New Gretna, Tuckerton | Northern terminus of the concurrency with US 9; northbound exit and southbound entrance | |
52.70 | 84.81 | 52 | New Gretna | Southbound exit and northbound entrance; access via CR 654 | |||
53.54 | 86.16 | New Gretna Toll Plaza (northbound) | |||||
Ocean | Little Egg Harbor Township | 58.69 | 94.45 | 58 | CR 539 – Little Egg Harbor, Whiting, Tuckerton | Signed for Whiting northbound, Tuckerton southbound | |
Stafford Township | 64.11 | 103.18 | 63 | Route 72 – Long Beach Island, Pemberton | Signed as exits 63A (east) and 63B (west) northbound | ||
Barnegat Township | 67.81 | 109.13 | 67 | CR 554 – Barnegat, Pemberton | Signed as exits 67A (east) and 67B (west) southbound; Pemberton not signed northbound | ||
68.61 | 110.42 | Barnegat Toll Plaza (southbound) | |||||
Ocean Township | 70.45 | 113.38 | 69 | CR 532 – Waretown | Tolled southbound exit and northbound entrance | ||
Lacey Township | 75.34 | 121.25 | 74 | Forked River | Tolled southbound exit and northbound entrance; access via CR 614 | ||
Berkeley Township | 77.40 | 124.56 | 77 | Berkeley | Tolled southbound exit and northbound entrance; access via CR 618 / CR 619 | ||
South Toms River | 80.85 | 130.12 | 80 | US 9 south / CR 530 / CR 619 south – Beachwood, South Toms River | Southern terminus of the concurrency with US 9; southbound exit and northbound entrance | ||
Toms River | 81.85 | 131.72 | 81 | Lakehurst Road – Toms River | Access via CR 527 | ||
82.35 | 132.53 | 82 | Route 37 – Seaside Heights, Lakehurst | Signed as exits 82 (east) and 82A (west) | |||
84.10 | 135.35 | 83 | US 9 north / Route 166 south / CR 571 – Lakewood | Northern terminus of the concurrency with US 9; no southbound exit | |||
84.72 | 136.34 | Toms River Toll Plaza | |||||
Lakewood Township | 89.36 | 143.81 | 88 | 89A | Route 70 – Lakehurst, Brick, Pt Pleasant | Tolled southbound exit and northbound entrance; signed as exits 89A (east) and 89B (west) southbound | |
90.18 | 145.13 | 89B[a] 89C[b] | CR 528 – Lakewood | Tolled southbound exit and northbound entrance | |||
Brick Township | 91.10 | 146.61 | 90 | CR 549 south – Brick | Northbound exit and southbound entrance | ||
92.62 | 149.06 | 91 | CR 549 – Lakewood, Brick, Herbertsville, Point Pleasant | Tolled southbound exit and northbound entrance; signed as exits 91B (south) and 91A (north) southbound | |||
Monmouth | Wall Township | 98.23 | 158.09 | 96-97A | 98 | I-195 west / Route 138 east / Route 34 – Belmar, Trenton | Tolled southbound exit and northbound entrance; eastern terminus of I-195; exits 35A-36 on Route 138 |
Tinton Falls | 101.24 | 162.93 | 100 | 100A | Route 33 east – Ocean Grove, Bradley Beach | Bradley Beach not signed southbound | |
101.49 | 163.33 | 100A | 100B | Route 66 east – Asbury Park | Northbound exit and southbound entrance | ||
101.74 | 163.73 | 100A[b] 100B[a] | 100B[b] 100C[a] | Route 33 west – Freehold | |||
103.15 | 166.00 | 102 | Neptune, Asbury Park | Southbound exit and northbound entrance; access via CR 16 | |||
103.96 | 167.31 | Asbury Park Toll Plaza (northbound) | |||||
104.20 | 167.69 | South end of the local-express lanes split | |||||
106.12– 106.39 | 170.78– 171.22 | 105 | Route 18 north / Route 36 north – New Brunswick, Eatontown, Long Branch[a] Route 18 / Route 36 north – Tinton Falls, Eatontown, Long Branch[b] | Tolled northbound entrance; southbound exit and northbound entrance from the express lanes; no northbound access to Route 18 south; no southbound access to Route 18 from the express lanes; all trucks must exit; signed for New Brunswick northbound, Tinton Falls southbound; western terminus of Route 36 | |||
Middletown Township | 110.14 | 177.25 | 109 | CR 520 – Red Bank, Lincroft | Tolled southbound exit and northbound entrance | ||
Middletown–Holmdel township line | 113.88 | 183.27 | 114 | Holmdel, Middletown | Tolled southbound exit and northbound entrance; access via CR 52 | ||
Holmdel Township | 115.85 | 186.44 | 116 | PNC Bank Arts Center | Exit number only signed at gore | ||
117.00 | 188.29 | Crossover between the express and the local roadways | |||||
Hazlet | 118.50 | 190.71 | 117 | Route 35 / Route 36 south – Hazlet, Keyport | Tolled southbound exit and northbound entrance; southbound exit and northbound entrance from express lanes; northern terminus of Route 36 | ||
Aberdeen Township | 118.79 | 191.17 | 117A | 118 | Aberdeen | Access via CR 3; southbound exit (tolled) and entrance | |
Middlesex | Old Bridge Township | 121.13 | 194.94 | 120 | Laurence Harbor, Matawan | Access via CR 626; to Cheesequake State Park | |
Sayreville | 124.64 | 200.59 | 123 | US 9 south – Sayreville, Old Bridge | Southbound exit and northbound entrance | ||
124.99 | 201.15 | 124 | Main Street | Southbound exit and northbound entrance; access via CR 670 | |||
125.28 | 201.62 | North end of the local-express lanes split | |||||
125.68 | 202.26 | Raritan Toll Plaza (southbound) | |||||
126.36 | 203.36 | 125 | US 9 south / Route 35 – Sayreville, South Amboy[a] Chevalier Avenue[b] | E-ZPass-only toll on southbound exit;[263] signed for US 9/Route 35/Sayreville/South Amboy northbound, Chevalier Avenue southbound | |||
Raritan River | 127.33 | 204.92 | Driscoll Bridge | ||||
Woodbridge Township | 128.22 | 206.35 | 127A[264] | 127 | US 9 north / Route 440 to I-287 north – Woodbridge, Staten Island | Northbound exit and southbound entrance | |
129.50 | 208.41 | 128 | 129 | I-95 / N.J. Turnpike – New York City, Trenton, Philadelphia | Exit 11 on I-95 / N.J. Turnpike;[265] signed for Trenton northbound, Philadelphia southbound | ||
To US 9 / Route 440 / I-287 north – Woodbridge, Perth Amboy | Southbound exit and northbound entrance | ||||||
130.63 | 210.23 | 130 | US 1 – Trenton, Newark | Southbound exit and northbound entrance; signed as exits 130A (north) and 130B (south) | |||
131.33 | 211.36 | 131A | Wood Avenue South (CR 649 north) | Signed as exit 131 southbound | |||
131.83 | 212.16 | 131B | Metropark | Northbound exit and southbound entrance; access via CR 657 | |||
131.97 | 212.39 | 131[266] | 132 | Route 27 – Iselin, Metuchen | |||
Union | Clark | 136.22 | 219.22 | 135 | Clark, Westfield | Access via CR 613 | |
Cranford | 137.59 | 221.43 | 136 | Linden, Roselle | Access via CR 607 / CR 615 | ||
138.74 | 223.28 | 137 | Route 28 – Elizabeth, Roselle Park, Cranford | Signed for Roselle Park southbound, Elizabeth northbound | |||
Kenilworth | 140.34 | 225.86 | 138 | CR 509 – Kenilworth | |||
Union Township | 141.10 | 227.08 | 139A | Roselle Park | Northbound exit and entrance; access via CR 619 | ||
141.26 | 227.34 | 139B[a] 140[b] | 139B[a] 140A[b] | Union[a] Route 82 west – Union[b] | Route 82 not signed northbound | ||
141.70 | 228.04 | 140A | 140B | US 22 / Route 82 east – Hillside[a] US 22 / Route 82 east – Elizabeth, Somerville[b] | Signed as exit 140 northbound; signed for Elizabeth/Somerville southbound, Hillside northbound | ||
142.10 | 228.69 | 141 | Vauxhall Road | Southbound exit and northbound entrance; access via CR 630 | |||
Hillside | 142.66 | 229.59 | Union Toll Plaza (northbound) | ||||
142.80– 142.90 | 229.81– 229.98 | 142 | I-78 to N.J. Turnpike (I-95) – Springfield, Newark Airport, Newark | Tolled northbound entrance; signed as exits 142A (east) and 142B (west); exit 52 (I-78) | |||
143.00 | 230.14 | 142A[91] | 142C | Maplewood | Northbound exit and southbound entrance; access via North Union Avenue | ||
Essex | Irvington | 144.00 | 231.75 | 143 | To Route 124 west – Irvington, Maplewood, Hillside | Access via CR 602 / CR 603; signed as exits 143A (Hillside), 143B (Maplewood), and 143C (Route 124) southbound | |
145.98 | 234.93 | 144 | CR 510 (South Orange Avenue) | Tolled northbound exit and southbound entrance | |||
East Orange | 146.93– 147.15 | 236.46– 236.81 | 145–145A | 145 | I-280 / CR 508 / CR 509 – Newark, The Oranges | Tolled southbound entrance; exit 12B on I-280; no southbound access to CR 509; CR 509 not signed | |
146 | Springdale Avenue – East Orange, Newark Area[103] | Former northbound exit and southbound entrance; closed January 12, 1966 [90] | |||||
148.44 | 238.89 | 147 | East Orange | Southbound exit and northbound entrance; access via Springdale Avenue | |||
Bloomfield | 149.20 | 240.11 | 148 | CR 506 Spur / CR 509 – Bloomfield, Glen Ridge[a] CR 509 / CR 506 Spur – Bloomfield[b] | Tolled northbound exit and southbound entrance; Glen Ridge not signed southbound | ||
150.22 | 241.76 | 148A[267] | 149 | CR 506 – Glen Ridge, Belleville | Southbound exit and northbound entrance | ||
150.66 | 242.46 | Essex Toll Plaza (southbound) | |||||
151.11 | 243.19 | 149A[267] | 150 | Hoover Avenue (CR 651) | Northbound exit and southbound entrance | ||
152.40 | 245.26 | 151 | Montclair, Nutley | Tolled southbound exit and northbound entrance; access via CR 655 | |||
Passaic | Clifton | 154.06– 154.45 | 247.94– 248.56 | 153 | Route 3 to US 46 west – Secaucus, Wayne | Tolled southbound exit and northbound entrance; signed as exits 153A (east) and 153B (west) northbound; no southbound access to Route 3 west | |
155.91 | 250.91 | 154 | US 46 east – Clifton | Northbound exit and southbound entrance[268] | |||
US 46 west – Clifton | Southbound exit and northbound entrance[268] | ||||||
156.40 | 251.70 | 155P | 155A | Route 19 north to I-80 west – Paterson | Northbound left exit and southbound entrance | ||
156.68 | 252.15 | 155 | 155B | Passaic | Northbound exit and southbound entrance; access via CR 702 | ||
158.19 | 254.58 | 156 | Route 20 north – Elmwood Park | Northbound exit and southbound entrance; access via US 46 | |||
Bergen | Elmwood Park | 158.87 | 255.68 | 157 | US 46 east – Garfield | Northbound exit and southbound entrance | |
US 46 west to Route 20 north – Garfield | Southbound exit and northbound entrance | ||||||
Saddle Brook | 160.00– 160.35 | 257.50– 258.06 | 158 | 159 | I-80 – Saddle Brook, George Washington Bridge[a] I-80 – Saddle Brook, Paterson[b] | Tolled northbound exit; no northbound access to I-80 west; access to Saddle Brook via CR 67; signed for Paterson southbound, George Washington Bridge northbound; exit 62A (I-80)[82] | |
160.46 | 258.24 | Bergen Toll Plaza (northbound) | |||||
Paramus | 161.53 | 259.96 | 160 | To Route 208 north – Fair Lawn, Hackensack | Northbound exit and southbound entrance; access via CR 62 | ||
161.88 | 260.52 | 161 | Route 4 east / Route 17 – Paramus | Northbound exit and southbound entrance; Route 17 not signed | |||
163.06– 163.29 | 262.42– 262.79 | 163 | Route 17 – Paramus, George Washington Bridge, Mahwah | Same-directional access only | |||
164.94 | 265.45 | 165 | Ridgewood, Oradell | Tolled northbound exit and southbound entrance; access via CR 80;[269] signed as exits 165A (Oradell) and 165B (Ridgewood) | |||
165.93 | 267.04 | 166 | Washington, Westwood | Southbound exit and northbound entrance; access via CR 110[269] | |||
Washington Township | 166.25 | 267.55 | Pascack Valley Toll Plaza[b] | ||||
167.46 | 269.50 | 168 | CR 502 – Washington, Westwood | Northbound exit and southbound entrance[269] | |||
Woodcliff Lake | 170.15 | 273.83 | 171 | Woodcliff Lake, Saddle River | Northbound exit and southbound entrance; access via CR S73 | ||
Montvale | 171.52 | 276.03 | 172 | Montvale, Park Ridge | Northbound exit and southbound entrance; access via CR 94 | ||
172.40 | 277.45 | – | To I-87 / I-287 / New York Thruway – New York City, Albany | Northern terminus; New York state line; access via G.S. Parkway Connector | |||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
[edit]References
[edit]- ^ a b c d e f g h i j k l m n o p q r s "Garden State Parkway straight line diagram" (PDF). New Jersey Department of Transportation. Retrieved March 17, 2020.
- ^ Cauchon, Dennis (February 5, 2008). "Drivers to see major toll hikes". USA Today. Archived from the original on January 31, 2008. Retrieved May 31, 2010.
- ^ a b c d e f g h i j k l m n o p "Overview Map of the Garden State Parkway (NJ 444)" (Map). Google Maps. Retrieved April 22, 2018.
- ^ "N.J.A.C. 19:9-1.2" (PDF).
- ^ "N.J.A.C. 19:9-1.9(b)" (PDF).
- ^ Federal Highway Administration. National Highway System: New Jersey (PDF) (Map). Scale not given. Washington, DC: Federal Highway Administration. Retrieved August 29, 2019.
- ^ Natzke, Stefan; Neathery, Mike; Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Federal Highway Administration. Archived from the original on September 24, 2012. Retrieved July 1, 2012.
- ^ a b c d e f g h "2019 New Jersey Turnpike Authority Bridge Inspection Program" (PDF). New Jersey Turnpike Authority. August 2, 2018. Retrieved October 12, 2019.
- ^ New Jersey Department of Transportation (2019). Monmouth County National Highway System Routes - MAP - 21 (PDF) (Map). Scale not given. Trenton: New Jersey Department of Transportation. Retrieved January 18, 2020.
- ^ "Minimizing congestion and supporting riverfront development". Mott MacDonald. Retrieved December 24, 2019.
With 15 travel lanes, the Driscoll Bridge, which carries the Garden State Parkway over the Raritan River, is the world's widest highway bridge. It is also one of the busiest, crossed by about 400,000 drivers each day.
- ^ "The Proposed Garden State Parkway in New Jersey" (Map). The Central New Jersey Home News. New Brunswick, New Jersey. January 29, 1942. p. 8. Retrieved May 7, 2021 – via Newspapers.com.
- ^ State of New Jersey, Laws of 1946, Chapter 117.
- ^ State of New Jersey (1927). 1927 New Jersey Road Map (Map). State of New Jersey. Archived from the original on March 13, 2016. Retrieved October 8, 2008.
- ^ "Route 4 Parkway Section Now Open". The Record. June 29, 1950. p. 2. Retrieved January 21, 2024.
- ^ a b Laurie, Maxine N.; Mappen, Marc (2004–2005). "Garden State Parkway". Encyclopedia of New Jersey. Rutgers University Press. p. 305.
- ^ a b c d "First Section of Route 4 Parkway is Completed". The Central New Jersey Home News. October 29, 1950. p. 1, 32. Retrieved April 14, 2018 – via Newspapers.com.
- ^ "Last Link of New Parkway Opened Yesterday A. M." The Daily Register. November 2, 1950. p. 2. Retrieved January 22, 2024.
- ^ "First Section Of Freeway Opens Today". Press of Atlantic City. June 29, 1951. p. 15. Retrieved January 22, 2024.
- ^ United States Geological Survey (1957). Stone Harbor, NJ (Map). 1:24000.
- ^ "Toms River Bypass To Open Today". Courier-Post. July 3, 1952. p. 2. Retrieved January 22, 2024.
- ^ New Jersey Highway Authority (January 30, 1952). First Annual Report. Trenton: New Jersey Highway Authority. Retrieved August 14, 2024 – via New Jersey State Library.[page needed]
- ^ "Cranford–Union Section of Parkway Opens Today". The Herald-News. July 16, 1953. p. 1. Retrieved January 22, 2024 – via Newspapers.com.
- ^ "Pedestrians Ruled Off New Parkway". The Herald-News. Passaic, New Jersey. September 16, 1953. p. 16. Retrieved July 9, 2023 – via Newspapers.com.
- ^ "First Tolls Being Taken on Parkway". The Herald-News. January 15, 1954. p. 14. Retrieved January 22, 2024.
- ^ "Parkway Opens In Ocean County". The Daily Register. July 15, 1954. p. 17. Retrieved January 22, 2024.
- ^ "42-Mile Shore Parkway Link Opens Tomorrow". Asbury Park Press. July 29, 1954. p. 1. Retrieved January 22, 2024.
- ^ "New Garden State Link. Raritan Bridge Is Opened for Northbound Traffic". The New York Times. Associated Press. July 31, 1954. Retrieved March 18, 2009.
The New Jersey Highway Authority today opened a new link in the Garden State Parkway -- the high-level bridge over the Raritan River for northbound traffic.
- ^ "Raritan River Bridge On Parkway to Open". The Bayonne Times. July 29, 1954. p. 13. Retrieved January 22, 2024.
- ^ "State Parkway Link Opened". The Courier-News. August 5, 1954. p. 3. Retrieved January 22, 2024.
- ^ "Parkway Open to New Gretna". Press of Atlantic City. August 8, 1954. p. 1. Retrieved January 22, 2024.
- ^ "Atlantic Co. Section Of Parkway Opens". Press of Atlantic City. August 12, 1954. p. 1. Retrieved January 22, 2024.
- ^ "Pike–Mullica G.S. Parkway Section Open". Press of Atlantic City. August 21, 1954. p. 13. Retrieved January 25, 2024.
- ^ "New Parkway Stretch Opens". The Courier-News. September 23, 1954. p. 15. Retrieved January 22, 2024.
- ^ "Garden State Parkway Links 113 Unbroken Miles Tomorrow". The Daily Journal. August 27, 1954. p. 1. Retrieved January 22, 2024.
- ^ "Parkway Open To Wildwood By Labor Day". Press of Atlantic City. August 26, 1954. p. 1. Retrieved January 22, 2024.
- ^ "Cape Parkway Strip Opened". Press of Atlantic City. September 4, 1954. p. 1. Retrieved January 22, 2024.
- ^ "Parkway Now Links Irvington, Cape May". Press of Atlantic City. October 11, 1954. p. 10. Retrieved January 22, 2024.
- ^ Higgins, Columb (November 18, 2016). "Last of Beesleys Point Bridge blasted". The Press of Atlantic City. Gazette of Upper Township. Retrieved July 22, 2019.
- ^ a b Ahlers, Bob (July 19, 2011). "Funding Failed, Tolls Imposed to Pay for Garden State Parkway". Cape May County Herald. Retrieved September 14, 2018.
- ^ "Controversial Section Of Parkway Opens". Press of Atlantic City. December 9, 1954. p. 2. Retrieved January 22, 2024.
- ^ "Parkway Opens Contested Lane". Press of Atlantic City. January 10, 1955. p. 11. Retrieved January 22, 2024.
- ^ "Parkway Opens Without Ceremony". The Herald-News. January 19, 1955. p. 1. Retrieved January 22, 2024.
- ^ "Parkway Barriers To Be Removed". The Herald-News. January 21, 1955. p. 1. Retrieved January 22, 2024.
- ^ "Garden State Parkway Opens Clifton Stretch". The Herald-News. January 4, 1955. p. 1. Retrieved January 22, 2024.
- ^ "Parkway Issued Rules Booklet". The Central New Jersey Home News. New Brunswick, New Jersey. May 10, 1955. p. 9. Retrieved November 18, 2018 – via Newspapers.com.
- ^ a b c d "Parkway Picnic Area Stymied". The Asbury Park Press. May 27, 1955. p. 19. Retrieved April 14, 2014 – via Newspapers.com.
- ^ "Garden State Parkway Now Completely Divided Highway". Ridgewood Herald-News. November 3, 1955. p. 10. Retrieved January 22, 2024 – via Newspapers.com.
- ^ a b Garden State Parkway: 1956 Annual Report (Report). New Jersey Highway Authority. 1956. Retrieved July 2, 2024 – via New Jersey State Library.
- ^ "New Great Egg Harbor Bay Bridge To Be Dedicated By Parkway With Pageant Today". Press of Atlantic City. June 16, 1956. p. 1. Retrieved January 22, 2024.
- ^ "Cement Feature Eliminates Steel". The Record. Hackensack, NJ. August 29, 1957. p. 44. Retrieved July 4, 2024.
- ^ State of New Jersey, Laws of 1929, Chapter 105, Page 386, Section 1.
- ^ "Parkway Road Open for Use". The Record. July 3, 1957. p. 6. Retrieved January 22, 2024.
- ^ "New Thruway Link Ready For Travel". The Record. August 29, 1957. p. 43. Retrieved January 22, 2024.
- ^ "Drivers Crowd Parkway Link". Bergen Evening Record. July 5, 1957. p. 1. Retrieved June 19, 2024.
- ^ "No U-Turns Allowed: Garden State Parkway Bars Them, Even to Rectify Error". The New York Times. February 8, 1958.
- ^ "Work Begins on Clifton Interchange of Parkway". The Herald-News. Passaic, New Jersey. May 2, 1958. pp. 1, 2. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Parkway-Rt. 46 Job Proceeds in Clifton". The Paterson Evening News. August 5, 1958. p. 1. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Early A.M. Detour Tomorrow in Clifton at Parkway, Rt. 46". The Herald-News. Passaic, New Jersey. September 11, 1958. p. 2. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Clifton's New Parkway Ramps Open Tuesday". The Herald-News. Passaic, New Jersey. December 25, 1958. p. 24. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Plan Program For Parkway Interchange". Asbury Park Press. January 13, 1959. p. 5. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "Parkway Work to Expand Interchange at Route 46". The Herald-News. Passaic, New Jersey. May 29, 1958. pp. 1, 10. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Parkway to Build 2 New Rt. 46 Ramps in Spring". The Herald-News. Passaic, New Jersey. December 12, 1957. p. 2. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Officials Dedicate Parkway Interchange With Route 46". The Herald-News. Passaic, New Jersey. January 16, 1959. p. 2. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "1,500,000 Cars Have Used New Parkway-Route 46 Links". The Herald-News. Passaic, New Jersey. February 29, 1960. p. 38. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Here's How Radar Operates". The Herald-News. Passaic, New Jersey. June 4, 1958. p. 20. Retrieved January 26, 2020 – via Newspapers.com.
- ^ "New Parkway Ramp Opened". The Courier-News. Plainfield, New Jersey. December 30, 1959. p. 19 – via Newspapers.com.
- ^ "Garden State Parkway to Ban Motorcycles on 1st". The Daily Record. Long Branch, New Jersey. January 6, 1961. p. 3. Retrieved October 11, 2019 – via Newspapers.com.
- ^ "New Parkway Ramp Opened". The Central New Jersey Home News. New Brunswick, New Jersey. December 5, 1962. p. 52 – via Newspapers.com.
- ^ "New Interchange Set for Middletown". The Daily Record. Long Branch, New Jersey. March 31, 1961. p. 1. Retrieved August 8, 2019 – via Newspapers.com.
- ^ "Road Costs Told for Bell Project". The Daily Register. Red Bank, New Jersey. June 23, 1961. pp. 1, 2. Retrieved August 8, 2019 – via Newspapers.com.
- ^ "New Parkway Interchange at Red Hill Road Approved". The Daily Register. Red Bank, New Jersey. November 28, 1961. pp. 1, 3. Retrieved August 8, 2019 – via Newspapers.com.
- ^ "New Interchange Set for Middletown". The Daily Record. Long Branch, New Jersey. March 31, 1961. p. 1. Retrieved August 8, 2019 – via Newspapers.com.
- ^ "OK $50,000 for Parkway Ramp Plans". The Asbury Park Evening Press. December 15, 1961. p. 2. Retrieved August 8, 2019 – via Newspapers.com.
- ^ "Issue Still Alive". The Daily Register. Red Bank, New Jersey. July 30, 1962. pp. 1, 2. Retrieved August 9, 2019 – via Newspapers.com.
- ^ a b "Parkway Opens Interchange in Monmouth". The Paterson Evening News. December 20, 1962. p. 24. Retrieved August 9, 2019 – via Newspapers.com.
- ^ "County Planners Protest Closing". The Daily Register. Red Bank, New Jersey. May 29, 1962. pp. 1–2. Retrieved August 9, 2019 – via Newspapers.com.
- ^ "N.J. Closing Exit 12 Of Cape Parkway For Safety Reasons". Press of Atlantic City. June 27, 1963. p. 3. Retrieved January 24, 2024 – via Newspapers.com.
- ^ "Interchange 38 to Open". The Daily Register. Red Bank, New Jersey. July 30, 1964. § 2, p. 1 – via Newspapers.com.
- ^ "Exit 38, July 30, 1964". The Millville Daily. July 30, 1964. p. 1 – via Newspapers.com.
- ^ "Outline Plans for Parkway Improvement". Asbury Park Press. May 3, 1962. p. 9. Retrieved June 20, 2024 – via Newspapers.com.
- ^ a b c "Garden State Parkway Projects Near Finished". The Daily Record. Long Branch, New Jersey. December 12, 1963. p. 27. Retrieved January 18, 2018 – via Newspapers.com.
- ^ a b "Parkway Exit 158 Southbound Closing Permanently in Week: To Be Replaced by Larger One in Bergen; Bloomfield–Clifton Stretch to Be Repaved". The Herald-News. Passaic, New Jersey. June 21, 1963. p. 2. Retrieved June 11, 2019 – via Newspapers.com.
- ^ "'Jungle of Wires': Power Lines Called Blemish on Parkway". Asbury Park Press. March 8, 1963. p. 21. Retrieved April 25, 2018 – via Newspapers.com.
- ^ "First Section Of Expressway Open From Bridge To Parkway". The Record. October 20, 1964. p. 4. Retrieved January 16, 2024.
- ^ "Parkway to Close Two Links with Route 46 in a Month". The Herald-News. Passaic, New Jersey. October 27, 1964. p. 13. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "Parkway Interchange to be Closed". The Courier-Post. Camden, New Jersey. March 4, 1965. p. 6. Retrieved January 21, 2019 – via Newspapers.com.
- ^ a b "Parkway Toll Irks Visitors, Worries Mayors". Asbury Park Press. p. 4. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "'Super-Safety Structures' for Garden State Parkway". The News. Paterson, New Jersey. December 11, 1965. p. 23. Retrieved June 20, 2024 – via Newspapers.com.
- ^ a b c "Tolls Start Jan. 12 on New Parkway Interchanges". The Paterson Daily News. December 29, 1965. p. 20. Retrieved March 27, 2019 – via Newspapers.com.
- ^ a b c "Parkway Reserves Future Exit Number". The Central New Jersey Home News. New Brunswick, New Jersey. May 11, 1966. p. 15. Retrieved January 20, 2019 – via Newspapers.com.
- ^ "Parkway Link Opens Tuesday". The Asbury Park Press. October 14, 1967. p. 20. Retrieved April 21, 2018 – via Newspapers.com.
- ^ a b "Paramus, Highway Authority Agree to Joint Road Construction Program". The Herald-News. Passaic, New Jersey. May 4, 1966. p. 65. Retrieved August 6, 2019 – via Newspapers.com.
- ^ "Fun, Sun at Wildwood, NJ". The Baltimore Sun. May 12, 1969. p. 6M. Retrieved August 22, 2022 – via Newspapers.com.
- ^ Waggoner, Walter H. (March 31, 1968). "Jersey Parkway's Tolls Pave a Road to the Arts". The New York Times. Retrieved June 20, 2024.
- ^ "Parkway Exit 116 for Those Going to Arts Center". The News. Patterson, New Jersey. August 8, 1968. p. 3 – via Newspapers.com.
- ^ Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
- ^ "Garden State Parkway Opens Entrance Ramps". The Herald-News. Passaic, New Jersey. November 30, 1966. p. 59. Retrieved August 6, 2019 – via Newspapers.com.
- ^ "Use of Interchange to Cost Dime Soon". The Bergen Record. Hackensack, New Jersey. February 10, 1967. p. 8. Retrieved August 6, 2019 – via Newspapers.com.
- ^ "Parkway Ramps to Go Into Use". The Paterson Morning Call. December 29, 1966. p. 27. Retrieved August 6, 2019 – via Newspapers.com.
- ^ "Court Bars Barricades; Interchange 166 Opens". The Paterson Daily News. September 23, 1967. p. 23. Retrieved August 7, 2019 – via Newspapers.com.
- ^ "Paramus, Highway Authority Agree to Joint Road Construction Program". The Herald-News. Passaic, New Jersey. May 4, 1966. p. 65. Retrieved August 6, 2019 – via Newspapers.com.
- ^ a b "Directories at Toll Plazas to Guide Parkway Motorists". The Herald-News. February 21, 1955. p. 53. Retrieved June 16, 2024.
- ^ "Peripheral Highway". The News. September 8, 1967. p. 36. Retrieved June 16, 2024.
- ^ "Route 20 Link Is Opened". The Morning Call. October 21, 1969. p. 19. Retrieved June 16, 2024.
- ^ "The Garden State Parkway Crossing the Great Egg Harbor Bay" (PDF). New Jersey Turnpike Authority. Retrieved March 6, 2018.
- ^ "Pike Linked To Parkway". The Courier-News. September 18, 1969. p. 15. Retrieved January 24, 2024 – via Newspapers.com.
- ^ "New Routes Cause P'way Confusion". Press of Atlantic City. November 26, 1970. p. 24. Retrieved January 24, 2024 – via Newspapers.com.
- ^ "Jersey Parkway Eliminates Two Southbound Exits". The New York Times. November 18, 1970.
- ^ "Parkway Traffic to Change Lanes Tuesday". Asbury Park Press. August 15, 1971. p. 11. Retrieved January 24, 2024 – via Newspapers.com.
- ^ "Open Second Parkway Span at Raritan River". The Daily Register. September 3, 1971. p. 2. Retrieved January 24, 2024 – via Newspapers.com.
- ^ "Parkway Widening to Ease Drives to Shore". The New York Times. February 6, 1972. Retrieved June 20, 2024.
- ^ "Part of Parkway Link Open to 287 traffic". The Central New Jersey Home News. New Brunswick, New Jersey. January 18, 1973. p. 12 – via Newspapers.com.
- ^ "Parkway's link with Route 440 opens Thursday". The Central New Jersey Home News. New Brunswick, New Jersey. June 26, 1973. p. 7. Retrieved June 20, 2024 – via Newspapers.com.
- ^ a b "Parkway Improvement Program to Take Toll". The Asbury Park Press. June 29, 1973. p. 7. Retrieved April 22, 2018 – via Newspapers.com.
- ^ a b "Parkway Changes". The Montclair Times. July 3, 1974. p. 28. Retrieved June 10, 2019 – via Newspapers.com.
- ^ "Parkway Plans to Shut Exits". Asbury Park Press. June 28, 1974. p. C8. Retrieved July 26, 2018 – via Newspapers.com.
- ^ "Coats of Rain Add to Driver's Woes". The Record. Hackensack, New Jersey. January 3, 1974. p. A3. Retrieved March 31, 2022 – via Newspapers.com.
- ^ a b "Exit 117A, February 21, 1974". Asbury Park Press. February 21, 1974. p. 2 – via Newspapers.com.
- ^ a b "Parkway express lane section open". The Daily Register. August 5, 1974. p. 5. Retrieved January 24, 2024 – via Newspapers.com.
- ^ Karey, Gerald (October 31, 1975). "Cyclists Back on Parkway at Midnight After 14 Years". The Asbury Park Press. p. 45. Retrieved October 11, 2019 – via Newspapers.com.
- ^ "Forbes Takes Cycle Ban Fight to Washington". The Courier-News. Plainfield, New Jersey. September 8, 1973. p. 3. Retrieved October 11, 2019 – via Newspapers.com.
- ^ Pierson, Melissa Holbrook (1998). The Perfect Vehicle: What It Is About Motorcycles. New York: W. W. Norton & Company. p. 82. ISBN 0-393-31809-5. OCLC 39520883.
- ^ Davies, John O. (April 14, 1976). "Another link to Rt. 78, but . . ". The Courier-News. Bridgewater, New Jersey. p. 3. Retrieved January 21, 2024 – via Newspapers.com.
- ^ "Parkway Reserves Future Exit Number". The Central New Jersey Home News. New Brunswick, New Jersey. May 1, 1966. p. 15. Retrieved April 22, 2018 – via Newspapers.com.
- ^ Mansnerus, Laura (May 7, 2000). "Road and Rail; Seeking a Line in the Sand". The New York Times. Retrieved September 12, 2019.
- ^ "Hugin: Extend Route 55 in South Jersey". Insider NJ. October 2, 2018. Retrieved January 14, 2020.
- ^ Barlow, Bill (February 1, 2018). "Safety Cited in Push for Route 55 Extension". Cape May County Herald. Retrieved January 14, 2020.
- ^ Sullivan, Ronald (February 20, 1977). "Turnpike Drops Cross-State Road". The New York Times. ISSN 0362-4331. Retrieved June 30, 2019.
- ^ "Old Bridge Glum about Road Signs". The Central New Jersey Home News. New Brunswick, New Jersey. February 27, 1980. p. 7. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "State Hires Company to Build Interchange". Asbury Park Press. April 23, 1982. p. C16. Retrieved August 9, 2019 – via Newspapers.com.
- ^ "New Garden State Parkway Exit Planned for Sayreville". The Central New Jersey Home News. New Brunswick, New Jersey. March 26, 1982. p. 27. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "Parkway Ramp Debuts Monday". The Central Jersey Home News. October 23, 1982. p. 3. Retrieved April 21, 2018 – via Newspapers.com.
- ^ "Parkway Interchange Opening in Sayreville". Asbury Park Press. November 19, 1982. p. 42. Retrieved June 20, 2024 – via Newspapers.com.
- ^ a b "Alternate Parkway Plan Unveiled". Asbury Park Press. February 1, 1980. p. 8. Retrieved October 12, 2019 – via Newspapers.com.
- ^ a b Simmons, Fred (January 22, 1980). "Environmental Agency Fights Parkway Proposal". Asbury Park Press. p. 2. Retrieved October 12, 2019 – via Newspapers.com.
- ^ Breen, Dan (June 15, 1983). "Homdel to fight exit at center". The Daily Register. Red Bank, New Jersey. pp. B1. Retrieved June 20, 2024 – via Newspapers.com.
- ^ Brackett, Georgia (July 26, 1985). "Parkway Exit Finally Opens". The Bergen Record. Hackensack, New Jersey. p. 3. Retrieved July 7, 2019 – via Newspapers.com.
- ^ "Parkway Is Seeking to End Bottleneck". The New York Times. May 1, 1973.
- ^ Hofmann, F. J. (March 1978). "Highway Widening Proceeds Behind Semi-Permanent Median Barrier". Civil Engineering. Vol. 48, no. 3. pp. 92–94. ISSN 0885-7024.
- ^ "Widening Jersey Parkway Stretch Is Bigger Job Than Original Road". The New York Times. February 28, 1978. Retrieved June 20, 2024.
- ^ "Few Motorists Use Car Pool Lane". Asbury Park Press. November 18, 1980. p. 32. Retrieved July 5, 2023 – via Newspapers.com.
- ^ "Through the Years: 1980s, NJDOT 50th Anniversary". New Jersey Department of Transportation. Retrieved June 20, 2024.
- ^ Garden State Parkway HOV Lane (Abridgment). National Academy of Sciences. 1983. ISBN 978-0-309-03520-0.
- ^ "Uncorking Parkway Bottlenecks". Asbury Park Press. October 23, 1983. p. 60. Retrieved June 20, 2024 – via Newspapers.com.
- ^ New Jersey Highway Authority (1985). Annual Report: New Jersey Highway Authority, Garden State Parkway, Garden State Arts Center. New Jersey Highway Authority. Retrieved August 10, 2024 – via Google Books.
- ^ a b New Jersey Turnpike Authority (2009). 2009 Annual Report (PDF). New Jersey Turnpike Authority.[page needed]
- ^ "New Parkway Interchange Open at Woodbridge Station". Asbury Park Press. November 20, 1986. p. 15. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "Parkway Has 'Free' Sections, but You Would Never Know It". Courier-Post. February 21, 1999. p. 11. Retrieved June 15, 2024.
- ^ "Parkway's most dangerous stretch gains lane-widening project contract". August 15, 2012.
- ^ "Parkway Opens New Exit". The Asbury Park Press. December 24, 1986. p. 21. Retrieved January 21, 2019 – via Newspapers.com.
- ^ "Garden State Parkway Contract #101A-691, Interchange 100". George Harms Construction Company.
- ^ "Route 18 Straight Line Diagram" (PDF). New Jersey Department of Transportation. 2006. Archived from the original (PDF) on March 22, 2006. Retrieved May 16, 2013.
- ^ "No Free Ride". Asbury Park Press. November 21, 1996. p. 1. Retrieved September 2, 2021 – via Newspapers.com.
- ^ Berzok, Jim (April 1, 1997). "Media Advisory" (Press release). New Jersey Department of Transportation. Retrieved June 20, 2024.
- ^ "Merit Award: Short Span - Garden State Parkway Interchange 159 - Bergen County, New Jersey" (PDF). American Institute of Steel Construction. Retrieved July 2, 2024.
- ^ Mikle, Jean (January 9, 1998). "New Parkway Ramp to Open 4 Months Early". Asbury Park Press. p. 3 – via Newspapers.com.
- ^ Koch, Jeff (September 23, 2018). "Garden State Parkway". Hemmings. Retrieved June 13, 2024.
- ^ "Toll Plaza Expansion on Road to Completion". Asbury Park Press (Photo). March 30, 1999. p. 2. Retrieved June 20, 2024 – via Newspapers.com.
- ^ a b Currie, Janet; Walker, Reed (October 2009). Traffic Congestion and Infant Health: Evidence from E-ZPass (PDF) (Report). p. 11. Archived from the original (PDF) on August 13, 2017. Retrieved February 2, 2020.
- ^ a b "E-ZPass: A plan that works for NJ" (PDF). July 11, 2002. pp. 9–10. Retrieved June 22, 2009.
- ^ "E-ZPass Lanes Open a Busy Plaza". The Central New Jersey Home News. New Brunswick, New Jersey. April 1, 2000. p. 1. Retrieved September 2, 2021 – via Newspapers.com.
- ^ "Berkeley parkway exchange under way". Asbury Park Press. June 24, 2001. p. 27. Retrieved July 5, 2024.
- ^ "Why There Will Always be Construction on the Parkway". April 20, 2018.
- ^ "Request for Bid" (PDF). New Jersey Turnpike Authority. Retrieved May 23, 2023.
- ^ "Garden State Parkway Interchange #89 improvements".
- ^ FY 2003-05 Statewide Transportation Improvement Program (PDF). New Jersey Department of Transportation. October 8, 2002. Retrieved June 20, 2024.
- ^ a b c "Garden State Parkway". NYCRoads. Retrieved May 27, 2024.
- ^ "Interchange #69 Ramp/Toll Improvements". George Harms Construction.
- ^ "NJDOT to begin reconstruction of Route I-280/Garden State Parkway Interchange 145" (Press release). New Jersey Department of Transportation. September 15, 2006. Retrieved June 14, 2007.
- ^ "Clark Circle". Union County Bureau of Traffic Safety & Maintenance. October 8, 2007. Archived from the original on October 15, 2007. Retrieved August 8, 2008.
- ^ "Berkeley parkway exchange under way". Asbury Park Press. June 24, 2001. p. 27. Retrieved June 20, 2024 – via Newspapers.com.
- ^ "Driscoll Bridge". Structurae. Retrieved January 15, 2020.
- ^ Yurasko, William (May 21, 2009). "Garden State Parkway's Driscoll Bridge now 15 lanes". Retrieved September 11, 2019.
- ^ Yang, Hong (2013). Effect of Removing Freeway Mainline Barrier Toll Plazas on Safety (PDF).
- ^ a b "2024 Toll Rates Garden State Parkway - Cash" (PDF). New Jersey Turnpike Authority. Retrieved April 1, 2023.
- ^ Rispoli, Michael (September 16, 2009). "Garden State Parkway, Route 78 connection to end commuter merry-go-round". The Star-Ledger. Retrieved January 13, 2010.
- ^ a b "NJDOT announces completion of project fully linking I-78 and the Garden State Parkway" (Press release). New Jersey Department of Transportation. September 21, 2011. Retrieved September 13, 2019.
- ^ Santiago, Katherine (September 17, 2009). "New link at Garden State Parkway, Route 78 to save commuters 10 minutes daily". The Star-Ledger. Retrieved September 13, 2019.
- ^ "N.J. to consider allowing trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
- ^ "N.J. won't allow trucks on Garden State Parkway north of exit 105". The Star-Ledger. Associated Press. April 18, 2011. Retrieved April 19, 2011.
- ^ "Garden State Parkway Interchange 151". Boswell Engineering. Retrieved August 16, 2024.
- ^ "New Jersey Sues Florida Pizza Shop". Philadelphia: WCAU-TV. Associated Press. July 24, 2014. Retrieved July 24, 2014.
- ^ "New Jersey Turnpike suit over Florida pizza shop logo tossed". CBS New York. New York: WCBS-TV. Associated Press. March 27, 2015.
- ^ New Jersey Tpk. Auth. v. Jersey Boardwalk Franchising Co., No. 2:14-cv-04589, 2015 WL 1403767 (D.N.J. March 26, 2015).
- ^ Russell, Mike (August 20, 2014). "Project to eliminate traffic lights on New Jersey's Parkway nears halfway mark". WHYY. Retrieved July 22, 2019.
- ^ "Advisory: Mechanic Street Exit from Garden State Parkway to Close Permanently". Middle Township New Jersey. Middle Township Municipality. Archived from the original on October 23, 2020. Retrieved January 31, 2020.
- ^ "Exit 0 Cape May Garden State Parkway map.jpg". Press of Atlantic City. March 18, 2016.
- ^ FY 2014–2023 Statewide Transportation Improvement Program: Transportation Authorities Project Descriptions (PDF). New Jersey Turnpike Authority. Retrieved August 10, 2024.
- ^ "Parkway Exit 88 May Be Gone, But 89 Takes You Where You Went Before In Brick". Brick, NJ Patch. November 13, 2014.
- ^ "New Exit Opens on Garden State Parkway in Ocean County". June 11, 2015.
- ^ Davis, Mike. "Exit 91: New Garden State Parkway ramps in Brick opening". Asbury Park Press.
- ^ "NJDOT's 2007–2010 Road Improvements" (PDF). (1.53 MB)
- ^ Nee, Daniel (July 13, 2016). "Parkway Exit 91 Project Now Shut Down, Brick Officials in the Dark". Brick Shorebeat. Retrieved September 3, 2016.
- ^ Higgs, Larry (September 12, 2017). "Big Parkway exit headache in North Jersey in final weeks, state says". NJ.com. Retrieved August 10, 2024.
- ^ Garden State Parkway Interchange 105 Improvements: Boroughs of Tinton Falls and Eatontown, Monmouth County (PDF). New Jersey Turnpike Authority. Archived (PDF) from the original on January 22, 2024.
- ^ "New Jersey to spend million for new Parkway Exit 105 in Tinton Falls". NewJerseyNewsroom.com. Retrieved January 22, 2024.
- ^ Higgs, Larry (January 28, 2018). "The biggest Turnpike and Parkway projects this year". NJ.com. Retrieved August 10, 2024.
- ^ "Barnegat's interchange to open Wednesday". Ashbury Park Press. May 20, 2009.[dead link]
- ^ Spahr, Rob (October 19, 2010). "New Garden State Parkway exit at Barnegat opens to traffic in Ocean County". The Press of Atlantic City. Retrieved September 16, 2019.
- ^ Weaver, Donna (May 26, 2011). "Parkway widening project in Ocean County to be ready for motorists today". The Press of Atlantic City. Retrieved September 12, 2019.
- ^ "Garden State Parkway Widening (Phase 2)". Atkins Global. Archived from the original on July 16, 2016. Retrieved September 12, 2019.
- ^ a b c Higgs, Larry (March 13, 2015). "What exit? New Parkway exit opens today as numbers change on others next week". NJ.com. NJ Advance Media.
- ^ "NJ-444, Galloway, New Jersey". Google Street View. May 2012.
- ^ D'Amico Staff, Diane (June 29, 2017). "Expressway Exit 7S at Garden State Parkway to open extra lane by weekend". Press of Atlantic City.
- ^ Wittkowski, Donald (July 23, 2015). "Garden State Parkway construction project focuses on new exits". Press of Atlantic City.
- ^ a b Higgs, Larry (January 28, 2018). "The biggest Turnpike and Parkway projects this year". NJ.com. NJ Advance Media. Retrieved September 12, 2019.
- ^ Auble, Amanda (February 18, 2019). "Garden State Parkway bridge construction nearing a close". The Press of Atlantic City. Retrieved September 16, 2019.
- ^ "EZPass only exit". New Jersey Turnpike Authority.
- ^ Zimmer, Russ. "Garden State Parkway: Exit 109 construction timeline". Asbury Park Press. Retrieved January 22, 2024.
- ^ Wingerter, E. Scott (May 4, 2020). "Red Bank GSP 109: Traffic Lights On, the 'Mousetrap" Expected to Open". TAPinto Red Bank. Retrieved August 11, 2024.
- ^ "Tolls for drivers leaving the northbound lanes on the Parkway at Exit 145 in The Oranges will be eliminated on July 26, 2018 at 10 pm while drivers enter the southbound lanes on the Parkway will be charged $1.00" (Press release). New Jersey Turnpike Authority. July 17, 2018. Retrieved July 17, 2018.
- ^ Higgs, Larry (March 27, 2018). "This frustrating Parkway bottleneck is going to be fixed. It will cost $63M". NJ.com. NJ Advance Media. Retrieved January 11, 2020.
- ^ "Project Overview". Garden State Parkway Exit 145. Retrieved January 11, 2020.
- ^ "Coronavirus News: Cash Tolls Returning to NJ Turnpike and Garden State Parkway". New York: WABC-TV. May 16, 2020. Archived from the original on January 14, 2021. Retrieved December 21, 2020.
- ^ "Ramp closure at Interchange 105" (Press release). New Jersey Turnpike Authority.
- ^ "Garden State Parkway Interchange 105 is complete". Retrieved May 27, 2024.
- ^ "GSP Roadway and Interchange 145 Toll Plaza". gsp140to143. Retrieved January 24, 2024.
- ^ @511njgsp (February 23, 2024). "Long term road construction and Roadwork, roadwork on Garden State Parkway northbound Exit 156 - US 46 (Clifton) exit ramp closed to traffic until further notice 511nj.org/event/ORI12374…" (Tweet). Retrieved July 3, 2024 – via Twitter.
- ^ Comstock, Lori (July 2, 2024). "Parkway exit has been closed for months. When will it reopen for North Jersey drivers?". Newton New Jersey Herald. Retrieved July 3, 2024.
- ^ "Proposed Operational Improvements Garden State Parkway, Milepost 80 to 83" (PDF). New Jersey Turnpike Authority. Retrieved May 27, 2024.
- ^ Brunetti Post, Michelle (July 22, 2020). "In Somers Point, one neighborhood's parkway-traffic solution is another's headache". The Press of Atlantic City. Retrieved July 24, 2020.
- ^ "Concerns over Garden State Parkway Exit Project Grow". The Press of Atlantic City. July 20, 2020.
- ^ a b "Proposed 2020 Capital Improvement Program" (PDF). New Jersey Turnpike Authority. Retrieved March 14, 2022.
- ^ "New Jersey Turnpike & Garden State Parkway widening projects".
- ^ Higgs, Larry (September 17, 2020). "Monorail in the median a possible alternative to widening the Parkway, officials say". NJ.com. NJ Advance Media. Retrieved August 21, 2024.
- ^ "New Jersey's Garden State Parkway could have ultra-light rail". Railway Track and Structures. Retrieved August 21, 2024.
- ^ a b "Toll Calculator". New Jersey Turnpike Authority. Retrieved April 17, 2019.
- ^ "2024 Toll Rates - Garden State Parkway / E-ZPass" (PDF). New Jersey Turnpike Authority. Retrieved April 1, 2023.
- ^ "Garden State Parkway Will Lose Exact Change Lanes At Tolls". Point Pleasant, NJ Patch. September 13, 2018. Retrieved October 3, 2019.
- ^ a b c Strauss, Robert (July 20, 2008). "Soon, Token Non Grata on the Garden State". The New York Times. Retrieved March 18, 2010.
- ^ "Video cameras now enforcing exact change tolls on GSP". News 12 New Jersey. October 17, 2011. Retrieved January 14, 2020.
- ^ "Union Watersphere". lostinjersey.wordpress.com. March 19, 2009. Retrieved February 23, 2012.
- ^ "Turnpike Authority removes exact change lanes on Garden State Parkway". News 12 New Jersey. November 1, 2018. Retrieved July 22, 2019.
- ^ Higgs, Larry (February 18, 2016). "Why can't older Parkway toll plazas get express E-ZPass?". nj.com. Retrieved October 3, 2019.
- ^ "ACM FAQ final.pub" (PDF). New Jersey Turnpike Authority. Retrieved October 3, 2019.
- ^ "Safety: New Parkway Lanes Take Toll". The Courier-News. Bridgewater, New Jersey. July 2, 1989. p. A4. Retrieved August 17, 2024 – via Newspapers.com.[full citation needed]
- ^ "New Jersey Officials Recycle Transit Tokens". American City & County. Retrieved January 31, 2020.
- ^ Higgs, Larry (September 27, 2022). "Garden State Parkway to go all E-ZPass, while paying cash may remain an option on the N.J. Turnpike". NJ.com. Advance Media.
- ^ a b "Parkway Closes Temporary Areas". The Plainfield Courier-News. July 8, 1955. p. 7. Retrieved April 20, 2018 – via Newspapers.com.
- ^ "Whitney Houston GSP Rest Area in Union Reopens". TAPinto Union. July 20, 2023.
- ^ "Connie Chung Service Area is Officially Open". Montclair Local. August 15, 2023.
- ^ "Gandolfini Service Area Closed For Renovations". Pearl River, NY Patch. December 12, 2023. Retrieved June 9, 2024.
- ^ The First Five Years of the Garden State Parkway. New Jersey Highway Authority. p. 29.
- ^ "On National New Jersey Day, Governor Murphy Announces New Jersey Turnpike Authority to Rename Nine Garden State Parkway Service Areas after New Jersey Icons and Hall of Fame Inductees" (Press release). Trenton: Office of the Governor of New Jersey. July 27, 2021. Retrieved July 28, 2021.
- ^ "9 Garden State Parkway Service Areas to Be Renamed After NJ Icons, Hall of Famers". New York: WNBC-TV. July 27, 2021. Retrieved July 27, 2021.
- ^ Walker, Tamara (March 8, 2024). "'Die Hard' star gets Jersey tribute: Bruce Willis rest stop coming soon". Asbury Park Press. Retrieved April 5, 2024.
- ^ "McDonald's restaurants at the Vauxhall and Brookdale South service areas on the Garden State Parkway are being replaced" (Press release). New Jersey Turnpike Authority. January 3, 2022.
- ^ a b c d e f g h i Higgs, Larry (August 4, 2019). "Skip the ShakeShack. We can still have an old-fashioned picnic on the Garden State Parkway". NJ.com. Retrieved August 13, 2019.
- ^ "Picnic Area Built Around Ancient Holly". The Asbury Park Evening Press. October 12, 1965. p. 13. Retrieved April 14, 2018 – via Newspapers.com.
- ^ Wittkowski, Donald (August 1, 2014). "Bathrooms gone, but ancient holly remains at parkway rest stop in Cape May". The Press of Atlantic City. Retrieved April 14, 2018.
- ^ "Body Parts Found In New Jersey". The New York Times. The Associated Press. July 12, 1992. Retrieved December 1, 2019.
- ^ a b c Coleman, Steven (October 24, 1987). "Rest Stop's Closing Blamed on Drugs, Sex". The Courier-News. p. 15. Retrieved October 13, 2017 – via Newspapers.com.
- ^ Sheppard, R.Z. (January 2, 1989). "Books: Serpents in The Garden State". Time. Archived from the original on October 22, 2010. Retrieved May 3, 2010.
- ^ a b "New Picnic Area Opens on Parkway". The Central New Jersey Home News. June 5, 1955. p. 28. Retrieved April 14, 2018 – via Newspapers.com.
- ^ a b "Mosquitos Get Double Trouble". The Plainfield Courier-News. February 24, 1961. p. 1. Retrieved April 14, 2018 – via Newspapers.com.
- ^ "Parkway Dedicates Telegraph Hill Park". The Asbury Park Evening Press. April 25, 1957. p. 1. Retrieved April 14, 2018 – via Newspapers.com.
- ^ a b Kasen, Timothy (July 21, 1988). "Parkway to Shut Down Cranford Rest Area". The Courier-News. p. 25. Retrieved October 13, 2017 – via Newspapers.com.
- ^ a b "Roadside Assistance Garden State Parkway". New Jersey Turnpike Authority. Retrieved September 13, 2019.
- ^ "Troop D Road Stations". New Jersey State Police. Retrieved May 20, 2024.
- ^ Coleman, Chris (March 11, 2023). "17 Things You Likely Don't Know About the Garden State Parkway". Cat Country 107.3.
- ^ "Garden State Parkway Exits (Milemarkers)". www.maikoff.net.
- ^ Alexander, Dan (July 7, 2017). "Garden State Parkway gets new Exit 125, but not all cars are allowed to use it". New Jersey 101.5. Retrieved September 13, 2019.
- ^ "Widening Work on Parkway Constricts Traffic". The Daily Register. Red Bank, New Jersey. October 14, 1970. p. 14. Retrieved October 15, 2019 – via Newspapers.com.
- ^ "Toll Highway Link Opens Tomorrow". The Asbury Park Press. September 17, 1969. pp. 1, 7. Retrieved April 23, 2018 – via Newspapers.com.
- ^ "What Exit? New Jersey Question Gets a Bit Trickier". Philadelphia: WCAU-TV. March 13, 2015. Retrieved November 4, 2015.
- ^ a b "Parkway Exit Changes Noted". The Montclair Times. June 1, 1967. p. 9. Retrieved March 27, 2019 – via Newspapers.com.
- ^ a b "To Open New Ramps at Rt. 46". The Daily Home News. December 26, 1958. p. 16. Retrieved April 22, 2018 – via Newspapers.com.
- ^ a b c "Parkway's Link-Up with Thruway Near". The Asbury Park Sunday Press. June 30, 1957. p. 6. Retrieved April 21, 2018 – via Newspapers.com.
External links
[edit]- Garden State Parkway
- Limited-access roads in New Jersey
- Parkways in the United States
- State highways in New Jersey
- Toll roads in New Jersey
- Transportation in Atlantic County, New Jersey
- Transportation in Bergen County, New Jersey
- Transportation in Burlington County, New Jersey
- Transportation in Cape May County, New Jersey
- Transportation in Essex County, New Jersey
- Transportation in Middlesex County, New Jersey
- Transportation in Monmouth County, New Jersey
- Transportation in Passaic County, New Jersey
- Transportation in the Pine Barrens (New Jersey)
- Transportation in Union County, New Jersey
- Transportation in Ocean County, New Jersey
- U.S. Route 9